Written question asked by Chris G Davies (Liberal Democrat), in the House of Commons. It was due for an answer on Tuesday, 30 January 1996. It was answered by John Watts (Conservative) on Tuesday, 30 January 1996 on behalf of the Department of Transport.
Dept of Transport
- Question
- What is his estimate of the cost of resignalling the West Coast Main Line using the proposed transmission based signalling system; and what are the financial savings anticipated from its introduction; how many companies are included on the short list for the development of the transmission-based signalling system; by what dates he will require signalling manufacturers, awarded contracts, to develop the transmission-based signalling system to complete or demonstrate system design, proof of performance, safety validated working system and manufacture of production equipment.
Secondary information
- Type
- Written question
- Reference
- 270 c617-8W; 12286;12283;12284
- Session
- 1995-96
- Subjects
- Costs Contracts for services Railways Railway network Railway signals Modernisation Safety Technology West Coast main line
- Contains statistics
- Yes
Librarians' tools
- Timestamp
- 2013-11-25 11:49:16 +0000
- URI
- http://data.parliament.uk/pimsdata/Hansard/PARLIAMENTARY_QUESTION_216307
- In Indexing
- http://indexing.parliament.uk/Content/Edit/1?uri=http://data.parliament.uk/pimsdata/Hansard/PARLIAMENTARY_QUESTION_216307
- In Solr
- https://search.parliament.uk/claw/solr/?id=http://data.parliament.uk/pimsdata/Hansard/PARLIAMENTARY_QUESTION_216307