Written question asked by Andrew Mackinlay (Labour), in the House of Commons. It was due for an answer on Monday, 10 March 1997. It was answered by John Watts (Conservative) on Monday, 10 March 1997 on behalf of the Department of Transport.


Dept of Transport

Question
What factors led him to conclude that the proposed D4 widening of the M25 between junctions 10 to 12 is no longer required.
Answer

Mr. Mackinlay: To ask the Secretary of State for Transport what factors led him to conclude that the proposed dual 4 widening of the M25 between junctions 10 to 12 is no longer required. [19582] Mr. Watts: The M25 between junctions 10 and 12 is already dual 4 lane standard. Proposals to widen this section of the motorway to more than dual 4 lanes were withdrawn from the roads programme in the 1995 review because the environmental impact was not considered acceptable in relation to the benefits.


Secondary information

Type
Written question
Reference
19582; 292 c29W
Session
1996-97
Subjects
Construction Motorways M25 Roads