Written question asked by Kevin Hughes (Labour) on Thursday, 20 May 2004, in the House of Commons. It was due for an answer on Wednesday, 26 May 2004. It was answered by Stephen Timms (Labour) on Wednesday, 26 May 2004 on behalf of the Department of Trade and Industry.
Dept of Trade and Industry
- Question
- To ask the Secretary of State for Trade and Industry, how much her Department spent on Clean Coal projects in each year since 2000 broken down by project; and what the estimated spending for 2004 is. - Inc tables.
- Answer
-
Mr. Kevin Hughes: To ask the Secretary of State for Trade and Industry how much her Department spent on Clean Coal projects in each year since 2000 broken down by project; and what the estimated spending for 2004 is. [175587] Mr. Timms: Spend on clean coal (R&D) programmes since 2000 is indicated as follows: _________________________________________________________________________________________________. £000 (Accruals) 2000-01 1,889 2001-02 1,702 2002-03 1,979 2003-04 1,090 2004-05 estimated 1,168 _________________________________________________________________________________________________. The following table shows the breakdown by project. Projects (R&D) _________________________________________________________________________________________________. Cleaner coal R&D 2000-01 2001-02 2002-03 2003-04 2004-05 Total programme (cash flow) Pulverised fuel -- -- 65,155 -- -- 65,155 meters--split control Advanced materials, 188,410 -- 211,854 145,210 163,540 709,014 modelling and lifting technologies for gas turbine components Development of a -- -- 219,365 -- 94,140 313,505 combustor strategy to cover a wide range of calorific values Novel gas cleaning/heat -- 28,560 24,762 -- 47,900 101,222 recovery system Materials for gasifier -- 9,390 25,275 -- 15,290 49,955 heat exchangers Concurrent measurements 31,910 -- 38,091 -- 70,001 of temperature and soot concentration of coal fired combustion flames Coal mineral -- 99,300 33,100 -- 66,200 198,600 transformations--effects on boiler ash Advanced monitoring -- -- 68,546 -- 45,910 114,456 using imaging for combustion in power station boilers Advanced coal modelling -- 37,600 -- 10,506 -- 48,106 Improved materials for -- 210,940 536,103 129,957 310,970 1,187,970 advanced PF boilers and steam turbines Optimisation of furnace -- 50,590 76,195 -- 126,785 design for in-furnace NOx reduction Combustion of low -- 97,620 -- -- -- 97,620 volatile coals in wall fired plant Optimisation of furnace -- 97,500 -- -- -- 97,500 mixing to enhance combustion efficiency in advanced low NOx systems Improvement in -- -- 239,428 -- 201,770 441,198 combustion efficiency in utility boilers Advanced optimisation of 3,100 7,347 -- -- 20,550 30,997 coal fired power plant operations Techno-economic -- 17,280 -- 15,030 17,690 50,000 evaluation of cleaner coal fired plant operability Modelling of particulate -- -- 19,926 13,653 56,710 90,289 and vapour deposition in gas turbines fired on coal derived gases Fabricated turbine -- 27,690 102,364 34,630 -- 164,684 rotors for advanced steam turbines Metallic filters for hot -- -- 7,690 -- 21,310 29,000 gas cleaning Advanced -- -- 34,722 -- 64,670 99,392 characterisation property database for Chinese and Indian (and other Asian) coals Advanced near burner -- -- 26,584 -- 22,000 48,584 flame diagnostics for ignition and stability studies on full scale pulverised coal flames UK collaboration with -- -- 14,123 -- 15,300 29,423 Netherlands and Australian NOx reduction research using overfire air staging Improving the efficiency -- 5,840 23,247 -- 20,910 49,997 and environmental performance of small scale combustion plant for increased export opportunities Application of CFD -- -- 139,300 31,100 -- 170,400 modelling to mill classifier design Predictive methods and -- -- 30,000 70,000 17,500 117,500 remedial measures for particle impact erosion and abrasion wear in cleaner coal energy conversion techs Once through the boiler -- 81,710 54,471 45,395 -- 181,576 with vertical tube furnace Advanced modelling and -- 25,810 -- 39,650 39,830 105,290 testing of thick section welded HCM2S "FOURCRACK" development -- -- 13,000 -- 122,500 135,500 of advanced coal fired plant steels to avoid premature failure by weld "Type IV" cracking Carbon burnout--coal -- -- 56,400 14,950 27,530 98,880 fitness effects Development of nitrogen -- -- 58,750 51,250 -- 110,000 stable isotope ratio measurements to apportion fuel and thermal NOx in coal conversion Enhanced Efficiency -- -- -- 19,848 246,460 266,308 Steam Turbine Blading for Cleaner Coal Plant Advanced (700C) PF Power -- -- -- -- 81,360 81,360 Plant Virtual Plant -- -- 22,990 -- -- 22,990 Demonstration Real time Efficiency -- -- -- 81,632 28,370 1 10,002 Measurements for Utility Boilers Demonstration of -- -- -- 140,000 -- 140,000 Co-firing Biomass at an Existing Coal Fired Power Station Demonstration of -- -- -- -- 755,460 755,460 Co-firing Biomass at an Existing Coal Fired Power Station Assessment of Ash -- -- -- -- 154,000 154,000 Refiring and Mineral Addition on Plant Performance and Ash Disposal On-line Fuel Tracking by -- -- 13,500 10,500 75,000 99,000 Advanced Flame Monitoring Combustion of Low -- -- -- 81,188 78,240 159,428 Volatile Coals in Wall Fired Plant--Phase 2 Minimising Particulate -- -- -- -- 118,000 118,000 Emissions through the Application of Neural Network Technology and Monitoring Systems Improved Methods for -- -- 15,181 -- -- 15,181 Coal and Waste Utilisation Former Cleaner Coal Programme Development of 62,680 0 0 0 0 62,680 Coal-over-Coal Reburn The Fate of Trace 9,063 0 0 0 0 9,063 Elements in PF Combustion Systems Improvement of 0 101 0 0 0 101 Combustion Efficiency in Low-NOx Combustion Systems Advanced Gas Turbine 121,409 0 0 0 0 121,409 Compressor Project--Phase 3 Model-based Plant 14,833 0 0 0 0 14,833 Optimisation Utilising Trends from Operational Instrumentation Fabrication of Steels 23,073 24,942 0 9,450 0 57,465 for Advanced Power Plant Gasifier Developments 3,068 0 0 0 0 3,068 and the Air Blown Gasification Cycle Total projects (R&D) 457,546 822,220 2,170,122 943,948 2,929,110 7,322,946 CC R&D Programme 1655 1677 1979 1081 1168 7560 Accruals (£000) Former CC Programme 234 25 0 9 0 269 Accruals (£000) Total Accruals R&D 1889 1702 1979 1090 1168 7829 Projects _________________________________________________________________________________________________.
Secondary information
- Type
- Written question
- Reference
- 175587; 421 c1674-6W
- Session
- 2003-04
- Subjects
- Coal Expenditure Pollution control Research
- Contains statistics
- Yes
- Link
- View this Written question on www.publications.parliament.uk
Librarians' tools
- Timestamp
- 2013-11-25 09:59:18 +0000
- URI
- http://data.parliament.uk/pimsdata/Hansard/PARLIAMENTARY_QUESTION_933588
- In Indexing
- http://indexing.parliament.uk/Content/Edit/1?uri=http://data.parliament.uk/pimsdata/Hansard/PARLIAMENTARY_QUESTION_933588
- In Solr
- https://search.parliament.uk/claw/solr/?id=http://data.parliament.uk/pimsdata/Hansard/PARLIAMENTARY_QUESTION_933588