Written question asked by John Whittingdale (Conservative) on Tuesday, 18 May 2004, in the House of Commons. It was due for an answer on Friday, 21 May 2004. It was answered by Tony McNulty (Labour) on Friday, 21 May 2004 on behalf of the Department for Transport.


Dept for Transport

Question
To ask the Secretary of State for Transport, how much clay will be produced as a result of excavations to build the new Channel Tunnel link station at Stratford; and how it is proposed to dispose of it. - Inc figures.
Answer

Mr. Whittingdale: To ask the Secretary of State for Transport how much clay will be produced as a result of excavations to build the new Channel Tunnel link station at Stratford; and how it is proposed to dispose of it. [175030] Mr. McNulty: About 270,000 cubic metres of clay have been excavated to form the station box at Stratford. The clay was deposited on the Stratford Lands, where the surface is being raised by about 6 m for the redevelopment of the lands.


Secondary information

Type
Written question
Reference
175030; 421 c1231W
Session
2003-04
Subjects
Construction High Speed 1 line Excavation Railway stations Stratford Station Clay
Contains statistics
Yes