Proceeding contribution from Hilary Benn (Labour) in the House of Commons on Monday, 23 July 2007. It occurred during Ministerial statement on Flooding.


Flooding

I am grateful to the hon. Gentleman both for his appreciation of the efforts made in response to this emergency and for the spirit in which he made his remarks. I would like to pick up the points that he raised. First, yes, the Met Office warning was pretty clear, but as the Gold Commander told me yesterday morning in Worcester, we do not know precisely which river catchment systems the rain will fall into until it actually happens. That certainly applied in respect of the M5 and the M50. We should bear it in mind that these are relatively new motorways, built to try and accommodate the removal of surface water. That shows one of the lessons that we have to reflect on as we design such roads in the future. The hon. Gentleman referred to institutional confusion, but I have to say that in all my discussions, including at meetings that I have chaired and talks with the Gold Commanders in Worcester and Gloucester, I have not found any institutional confusion at all. The system in place is the Gold Command system, which has complete oversight of what is required in the areas covered. The emergency response has included the evacuation of people, bringing supplies in and providing help and support—such as offering shelter even for some motorists who found themselves trapped because they could not travel on Friday evening. All of that happened precisely because of the arrangements that have been put in place. On the two barriers, it is the case that temporary barriers for Upton upon Severn and Worcester could not be deployed because of traffic congestion. In the case of the Upton upon Severn barrier, I am advised by the Environment Agency that even if it had been deployed, it would have been over-topped because of the weight of the water. In the case of Worcester, it would have protected about 30 homes. I accept that one of the lessons that needs to be learned is that if there are temporary barriers, they ought to be stored in a place that will enable them to be put up quickly. I will take that thought away with me. The hon. Gentleman makes a very important point on the availability of water supplies. Local authorities, together with the water company and, indeed, the general public, all have a part to play in ensuring that everybody who requires water will have it made available to them. On the Mythe water treatment works, I have asked the very question that the hon. Gentleman put to me of the chief executive of the Severn Trent company when I spoke to him late yesterday evening. I have said that we will give any assistance that he requires to get access to the Mythe water treatment plant once the water level falls so that the work of repairing it can happen. On the Environment Agency, there has been, as the hon. Gentleman knows because we discussed this last time, no cut to the capital budget. Some feasibility studies were held back for a bit because of the reduction in the budget, but that has been made up this year. It has had no effect at all on the response to the flooding over the past month. The additional funding that I announced to the House will come on stream. The precise details will be announced once the comprehensive spending comes out. It will have to take account of the fact that as those feasibility studies come in place, there will be a programme of capital works that the Environment Agency itself will want to fund. I am acutely conscious of the distress caused not only to members of the public because of what has happened to their houses and businesses, but also to farmers. The hon. Gentleman will be aware of the steps that I have already taken to lift the restriction on accessing water-logged land, which applies until the end of this month—I will review it in light of the current weather conditions—and to enable farmers to ask for access to set-aside land for grazing or foraging in the light of the damage caused to their crops, although many of them are still under water. As for looking ahead, the whole question of surface water drainage is a big one. The truth is that we are dealing with a system that has been in place for more than 150 years, and the surface water drainage system was not designed to cope with the unprecedented rainfall that we have been seeing. The most important lesson we can learn is that as we build from now on in we ensure that drainage can accommodate the flow of water that we currently see. As for the Bellwin rules, the hon. Gentleman will be aware that they were extended in response to the flooding that took place at the end of June. Those extensions were applied by my right hon. Friend the Prime Minister on Saturday to the local authorities affected. Capital work—repairs to possible damage to bridges and other structures—will be a matter for the individual Departments that are responsible for agreeing capital funding and approvals to discuss with the relevant local authorities. Finally, a lot of the issues that the hon. Gentleman raised and the questions that I and others have got about what can be done better in future will be picked up by the review. I am grateful to him for welcoming the fact that an independent person will oversee it.


Secondary information

Type
Proceeding contribution
Reference
463 c566-7 
Session
2006-07
Chamber / Committee
House of Commons chamber
Subjects
Contamination Flood control Energy supply Environment Agency Floods Pollution Property Power failures Water Water supply Warwickshire Oxfordshire Worcestershire Lincolnshire Bellwin scheme Water treatment Berkshire Herefordshire
Link
View this Proceeding contribution on www.publications.parliament.uk