Proceeding contribution from Hilary Benn (Labour) in the House of Commons on Monday, 23 July 2007. It occurred during Ministerial statement on Flooding.
Flooding
As I have already said to the hon. Gentleman, the Environment Agency very much regrets that in those two cases it was not able to get the temporary barriers through, although—as he heard me say a moment ago—even if they had been erected, the advice I have had from the agency is that it would not have made any difference, because they would have been over-topped in any case. However, the hon. Gentleman makes a fair point: if there are temporary barriers, it is important that they are capable of being put up. I undertake that we will look at the situation to ensure that that does not happen again.
Secondary information
- Type
- Proceeding contribution
- Reference
- 463 c571
- Session
- 2006-07
- Chamber / Committee
- House of Commons chamber
- Subjects
- Contamination Flood control Energy supply Environment Agency Floods Pollution Property Power failures Water Water supply Warwickshire Oxfordshire Worcestershire Lincolnshire Bellwin scheme Water treatment Berkshire Herefordshire
- Link
- View this Proceeding contribution on www.publications.parliament.uk
Librarians' tools
- Timestamp
- 2023-12-15 12:16:03 +0000
- URI
- http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_413221
- In Indexing
- http://indexing.parliament.uk/Content/Edit/1?uri=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_413221
- In Solr
- https://search.parliament.uk/claw/solr/?id=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_413221