Skip to main content

Proceeding contribution from Clive Betts (Labour) in the House of Commons on Monday, 23 July 2007. It occurred during Ministerial statement on Flooding.


Flooding

In Sheffield we had our floods three weeks ago, and one of the sites that I visited at the invitation of National Grid was the Neepsend transformer station, which was flooded, leaving several thousands of homes without electricity on a rotational basis. Furthermore, if the Ulley dam had burst its banks, the Brinsworth transformer station could have gone down, which would have left whole sections of Sheffield and Rotherham without electricity for several days. Could I have an assurance that the Secretary of State will ask the review to look at the vulnerability of our electricity supply system and the lack of back-up when a transformer system goes down?


Secondary information

Type
Proceeding contribution
Reference
463 c574 
Session
2006-07
Chamber / Committee
House of Commons chamber
Subjects
Contamination Flood control Energy supply Environment Agency Floods Pollution Property Power failures Water Water supply Warwickshire Oxfordshire Worcestershire Lincolnshire Bellwin scheme Water treatment Berkshire Herefordshire
Link
View this Proceeding contribution on www.publications.parliament.uk