Proceeding contribution from Hilary Benn (Labour) in the House of Commons on Monday, 23 July 2007. It occurred during Ministerial statement on Flooding.
Flooding
The hon. Gentleman raises an important point, but engineering and bridge works, of whatever nature, fall outwith the Bellwin rules, because those rules cover the immediate emergency clear-up costs. We have extended the time in which local authorities can make claims, because we recognise that the clear-up itself may take quite some time. The issue that he raised would be picked up in the normal discussions between the relevant department and the local authority. If it is a road that the Highways Agency has an interest in—[Interruption.] It is not. Well, it would need to be picked up by the existing systems.
Secondary information
- Type
- Proceeding contribution
- Reference
- 463 c577
- Session
- 2006-07
- Chamber / Committee
- House of Commons chamber
- Subjects
- Contamination Flood control Energy supply Environment Agency Floods Pollution Property Power failures Water Water supply Warwickshire Oxfordshire Worcestershire Lincolnshire Bellwin scheme Water treatment Berkshire Herefordshire
- Link
- View this Proceeding contribution on www.publications.parliament.uk
Librarians' tools
- Timestamp
- 2023-12-15 12:14:48 +0000
- URI
- http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_413253
- In Indexing
- http://indexing.parliament.uk/Content/Edit/1?uri=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_413253
- In Solr
- https://search.parliament.uk/claw/solr/?id=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_413253