Proceeding contribution from Chris Mole (Labour) in the House of Commons on Tuesday, 6 April 2010. It occurred during Adjournment debate on Kidderminster Railway Station.
Kidderminster Railway Station
It is good to be back again, Dr. McCrea. I congratulate the hon. Member for Wyre Forest (Dr. Taylor) on securing this debate on what is clearly an important issue for him and his constituents, as well as for others travelling to and from Kidderminster station. I listened carefully to his points, and the Government share his vision for stations to have that gateway role both to the railway and to the community that they serve. Kidderminster is one of London Midland's busiest stations, with 1.2 million passenger journeys recorded in 2008-09. London Midland operates most of the services to and from the station. Kidderminster station has quite a history, as the hon. Gentleman outlined. It opened in 1852 with the extension of the Oxford, Worcester and Wolverhampton railway from Worcester to Stourbridge by the Great Western Railway. I listened to the hon. Gentleman's description of the former building. I am told that a station building of mock-Tudor design survived until 1968, when it was demolished and replaced by the small brick building that stands today. The Severn Valley railway's southern terminus shares the same station approach road and is known as Kidderminster Town to distinguish it from Kidderminster station, for the reasons that the hon. Gentleman outlined. Kidderminster was one of the original stations chosen in 2006 for the Access for All programme. Work commenced on a £2.5 million project in November 2007 and encompassed an entirely new footbridge and two lifts, which provide a fully accessible route to and between both platforms. The project was completed last July. I was sorry to hear the hon. Gentleman's comments about the colour of the brickwork, but I understand that the project has generally been well received locally. Accessible stations make a huge difference to people's journey experience. I am referring not only to those with reduced mobility but to those carrying heavy luggage or pushing unwieldy pushchairs. I understand that there was some delay to completion of the works due to delays in obtaining listed building consent—I can understand that in the context of the area—but that those were resolved by cladding the new works with brick better to match the Victorian design of the station. A bid for funding from the Access for All small schemes fund in 2010-11 is under consideration. More recently, as part of its franchise obligation, London Midland has secured 100 extra car parking spaces for passengers from the Severn Valley railway in return for enhancements to the car parking facilities. As part of a passenger benefits package, London Midland is investing an additional £4.4 million in new high-quality information equipment, which could include improvements at Kidderminster. In an attempt to persuade more people to use the railway, 50,000 day rover tickets were made available for travel over the Christmas period, and an additional 400,000 advance purchase tickets will be made available over the next two years on some of London Midland's most popular routes. Again, passengers who use Kidderminster station may benefit from that initiative. There are plans to rejuvenate Kidderminster station through a £3.5 million project that would provide a new layout of the station forecourt with improved facilities for bus services, and a new station building with improved passenger facilities. An improved walking connection from the new station building to the Severn Valley railway station building is also being proposed. I heard the hon. Gentleman's comments about the traffic signals, but I can say little about that level of detail today, other than to encourage him to engage with the local authority and those with responsibilities for highways in Kidderminster to ensure that they are aware of his concerns and address them fully as the scheme develops. There is also a proposal for £2.5 million from the west midlands regional funding allocation to be used to fund improvements outside the station, and for a £1 million contribution from the national stations improvement programme to be used to fund the new station building. Smaller contributions from partner local authorities are also anticipated. I understand that a project board of key stakeholders has been formed to consider the best option for rejuvenating Kidderminster station. The board includes representatives from Worcestershire county council, Wyre Forest district council, Network Rail, London Midland, the Severn Valley railway and the Kidderminster railway museum. Public consultation on the detailed design of the station forecourt, including road and public transport access, was launched on 29 March, and the hon. Gentleman has put his comments on road access on the record. The plans envisage a large bus exchange, and improved car parking and drop-off areas. Worcestershire county council is writing to stakeholders, and I understand that it is happy to arrange a meeting to brief the hon. Gentleman on the project's details. We were happy to receive bids for small-scale rail schemes such as that at Kidderminster station in the refresh of the regional funding allocation advice that we requested from the regions last year. The west midlands region advised that the Kidderminster scheme was a priority for funding, and we responded positively to that advice in July last year. The regional funding allocation programme, particularly local authority schemes, are benefiting from record levels of spend at present, but clearly we need to exercise due caution, as any responsible Government would do, when considering requests that would add to the current commitment. Although I appreciate the urgency of the project, I cannot give the hon. Gentleman a guarantee that funding will be available for the scheme, but I can promise that the proposal is being carefully considered. Similarly, although the local delivery group responsible for the London Midland portfolio of stations has identified Kidderminster station as a candidate for the second tranche of funding from the national stations improvement programme, decisions on the second tranche schemes are not expected to be made until later in the year. I understand that there has been quite a bit of debate about the design of the new station building, with a number of stakeholders keen to ensure that the design meets heritage objectives and provides a suitable gateway to Kidderminster. In particular, people have argued—the hon. Gentleman has done so eloquently today—that it should be more in keeping with the character and feel of the Severn Valley railway's Kidderminster Town station. I understand that Network Rail has been considering using its modular station design at Kidderminster. Although the system is still in its infancy, there are already a number of examples of modular stations on the network at Greenhithe, Mitcham Eastfields, Corby and, most recently, Uckfield. Modular stations may provide an economical way to build new stations or rebuild existing facilities, and by minimising energy use they offer an excellent example of sustainable design. That addresses one angle—environmental impact—that the hon. Gentleman asked about.
Secondary information
- Type
- Proceeding contribution
- Reference
- 508 c291-3WH
- Session
- 2009-10
- Chamber / Committee
- Westminster Hall
- Subjects
- Building regulations Railway stations Road traffic Regeneration Worcestershire
- Link
- View this Proceeding contribution on www.publications.parliament.uk
Librarians' tools
- Timestamp
- 2025-03-30 13:23:08 +0100
- URI
- http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_637254
- In Indexing
- http://indexing.parliament.uk/Content/Edit/1?uri=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_637254
- In Solr
- https://search.parliament.uk/claw/solr/?id=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_637254