Skip to main content

Proceeding contribution from Lord Jenkin of Roding (Conservative) in the House of Lords on Thursday, 13 January 2011. It occurred during Debate on Revised Draft National Policy Statement for Nuclear Power Generation, volumes I and II (EN-6).


Revised Draft National Policy Statement for Nuclear Power Generation, volumes I and II (EN-6)

My Lords, I shall try to be bit shorter than I was on Tuesday, so as not to incur the wrath of the government Whip. I have checked the rules since then; yes, there is guidance, but those who took part in the debates last year will remember that I was rather longer, entirely without protest from anybody. However, in order to be shorter, I want to make only one substantive point to my noble friend on the Front Bench: it is on the question of sites, which other speakers have already addressed. I return to the point, hinted at by the noble Lord, Lord Teverson, as to what happens after 2025. These two things are very much related. Of course, I entirely understand—and this has been said very clearly, both in the papers and by the Minister in another place in the debate in December—that the eight designated sites, which are listed in EN-6, volume 1, are intended to be enough for up to 2025. I understand why Braystones and Kirksanton have been excluded from this first tranche. Although I think there were going to be some representations on that from one of the potential developers, they have not materialised. But I have to say that I remain very disappointed about the exclusion of Dungeness. This raises two separate but related issues—the case for approving Dungeness in the first place and, if it is not approved, what the implications are for the post-2025 investment. I am very pleased to see the noble Lord, Lord O'Neill, in his place. As the chairman of the Nuclear Industry Association, he will know that that is one question that it has asked. Additional sites may need to be found for development beyond 2025 in order to meet the target to reduce UK carbon emissions by 80 per cent by 2050. Those are two aspects of the question. I shall not argue the case extensively for Dungeness, as it was argued at considerable length in Committee and on the Floor of the House on 11 and 25 March last year. Without trying the patience of the Committee, I should like to rehearse briefly the arguments in favour and against. In favour is the argument that you have an existing nuclear site there, with Dungeness B still operating. It has excellent connections to the grid, when some of the other sites, particularly Sellafield, may need to have considerable investment. It is very strongly backed by the local community, by Shepway council and the other local authorities in the area. The noble Lord, Lord Teverson, acknowledged that point. There is a need for more baseload generating capacity in the southern half of the country to reduce the amount of transmission from the north. If it were to be included in the list, and applications could be made, it would be one of the first to be up and running. Those are quite powerful cases. Against this, one has the environmental argument. It is a unique coastal system with intrinsically important shingle sites. There are several internationally designated sites, including a special area of conservation and a special protection area. They are both part of the Natura 2000 network. It is also a proposed Ramsar site. I do not for one moment deny that those are powerful cases. The case for Dungeness has been argued several times in another place in the context of these national policy statements by my honourable friend Damian Collins, the Member of Parliament for Folkestone and Hythe. His latest intervention was in the debates on the statements on 1 December, in which he stressed the role of Natural England and referred to its belief that the development would somehow be an unavoidable and irreversible interference in the vegetated shingle. In that debate, my honourable friend the Minister, Charles Hendry, said—and this is the important point: "““The consultation is continuing, and, if additional evidence that changes that conclusion””—" the conclusion that Dungeness should not be in the list— "““emerges in the course of the meeting that I will have with my hon. Friend and his local authority's representatives, or in written submissions, we will take it into account””.—[Official Report, Commons, 1/12/10; col. 927.]" I read that as saying that to some extent this is an ongoing issue and cannot at this stage be definitively put to rest. I asked my honourable friend Damian Collins where the discussions had got to. His answer was that he had had a meeting with Mr Hendry, with officials and others present. He sent me a note, stating: "““Charles Hendry has agreed to contact Natural England to ask them for guidance on what evidence they would need to see to help alleviate their concerns about the damage to the shingle habitats at Dungeness. So rather than them just saying no, we are asking for their help in establishing an agenda that might help us take Dungeness forward. This would be the basis for us commissioning some further environmental research””." That is clearly ongoing business. The other night, I had a word with the noble Lord, Lord Smith of Finsbury, formerly involved with the Environment Agency. He advised me to get in touch with it, which I have done over the last couple of days. Only this morning, it sent me a really useful report that describes the history of the management of those shingle beaches at Dungeness. It goes back over decades; this is a long-standing problem, which of course did not prevent the building of the first and second nuclear power stations there. Because of the constant movement as a result of the tides, shingle has regularly been borrowed from the eastern end of the beach and placed on beach locations to the west where the erosion losses are most acute. That has been a regular process involving, obviously, thousands of tons of shingle, shifted from one end of the beach to the other. That work has had to be paid for by the nuclear power station—initially by British Energy, and now by Électricité de France, EDF, which runs Dungeness B. It is obligatory under the terms of the operating lease. We then come to the point where the special area of conservation was designated, and it turned out that what one might call the ““borrow pit””—the part of the beach from which the shingle came, which represents only about 1 per cent of the SAC area—was protected. The conclusion was drawn that the existing system had to cease. I quote from the report that I had only this morning: "““Last year, with our agreement, EDF commissioned Halcrow (consultants) to undertake detailed mapping and data gathering on shingle movement in the locality. The aim was to establish whether and where shingle could be extracted without detrimental impact on designated habitats. Halcrow identified two options and have since worked with NE””—" Natural England— "““to address their concerns with a view to developing a proposal that can form the basis of a viable planning application.""This is work-in-progress but we””—" the Environment Agency— "““are hopeful that such a proposal, and with it a viable planning application to KCC””—" Kent County Council— "““may be in place this spring. Following appropriate scrutiny by the planning authority, planning consent could be granted by summer, when we would start recycling shingle again””." By definition, that would clearly have the approval of Natural England; that is the context in which the whole negotiation is continuing. That is further evidence that this is all work in progress, which is what my honourable friend Damian Collins suggested in another place in December. Therefore, I contend that it is premature to rule out Dungeness as one of the designated sites for a new nuclear power station. I hope that my noble friend will be able to comment on what, for me, is new evidence about what is going on there in an attempt to deal with this very important shingle site, with the erosion of the coastline and with safeguarding the habitats. That leads to the second issue about the period beyond 2025. I have referred to this report—


Secondary information

Type
Proceeding contribution
Reference
723 c156-9GC 
Session
2010-12
Chamber / Committee
House of Lords Grand Committee
Subjects
Cumbria Finance Environment protection Infrastructure Floods Kent Planning permission Planning Radioactive waste Nuclear power Nuclear fuel reprocessing Nuclear power stations Security Waste management Infrastructure Planning Commission National policy statements Mixed oxide fuel
Link
View this Proceeding contribution on www.publications.parliament.uk