Proceeding contribution from Lord Davies of Stamford (Labour) in the House of Lords on Thursday, 13 January 2011. It occurred during Debate on Revised Draft National Policy Statement for Nuclear Power Generation, volumes I and II (EN-6).
Revised Draft National Policy Statement for Nuclear Power Generation, volumes I and II (EN-6)
My Lords, I totally agree with the noble Lord, Lord Jenkin, that there will almost certainly be a need during the next 20 years or so for more nuclear sites than are currently envisaged by the Government. Although I know nothing whatever about the specifics of Dungeness, I have already made a very strong case, and I will look forward to what the Minister says in response. Perhaps I may begin by surprising probably both sides of the Committee by offering an element of at least modest congratulation to the Government and the Conservative Party on the distance that they have travelled on this subject since I left the Conservative Party some four years ago. At that time, the Tory Party's doctrine was that nuclear power was a last resort. That was just one of the myriad issues on which I disagreed with that party at the time—it was not the most critical but it was important. I am very pleased to see that, in this matter at least if not in others, the Tory Party has advanced in the right direction. I still do not think that it has got to the right point. I think that its acceptance of nuclear is grudging and in some cases is based on something of a misunderstanding. I note that the overarching document, EN-1, states at paragraph 3.5.7: "““The Government believes that new nuclear generation would complement renewables””." That seems to be wrong on two grounds, the first political and the other technical. The political ground is that it does not emphasise sufficiently the enormous importance of nuclear. It implies that nuclear is just one of a whole series of possible sources of future power generation. It must be the major source of electricity generation in the future. Secondly, it is quite wrong to say that it ““complements”” renewables; it is baseload, and renewables are not. What complements renewables is the natural gas combined cycle generation capability which stands alongside renewables, so that when the wind is not blowing, which is about 70 per cent of the time in this country, it can immediately be switched on and replace that peak load. However, nuclear is not a reciprocal of renewables, as that sentence suggests. Therefore, I think that the Government have not quite grasped the enormous importance of nuclear even yet. We have with us a very able Minister who knows his brief very well. He made a response to a debate on this subject that I attended the other day to the effect that nuclear was not getting any subsidy because it was a proven technology. That seemed a very arbitrary and irrelevant criterion. It may well be that we do not need to give a subsidy to nuclear because nuclear investment will happen without it. If so, I would be the last to suggest that taxpayers' money should be added to it. However, the criterion should be whether it is necessary to give a subsidy to achieve a desired purpose for the future strategic interests of the country. Obviously, it is necessary to provide subsidies for tidal and wind power, which we are doing, and I support that. Obviously, it is necessary to provide subsidies for the whole area of carbon capture and storage, which is uncertain technologically. I am happy with that investment, with all its risks. Investments do involve risks, and I do not have to tell the Minister that, as he has an investment banking background. I am in favour of that too. However, the criterion should simply be whether it is necessary, not whether a technology is more or less proven. We all know that nuclear technology is subject the whole time to upgrading and improvements of various kinds. That attitude reflects again the feeling of a reluctant commitment to nuclear power which characterises the Government's policy, although that is a great deal better than the policy that I described, which persisted some four years ago. I hope that the Government will continue to advance in their thinking in the right direction. I have one or two specific questions that I shall take the opportunity to put to the Government with the chance to have the answers on the record, because I suspect that they will be of interest to others in this country apart from myself. The first one relates to the whole issue of timing, which seems to me absolutely urgent. We are behind time. Of course we should invest in nuclear, and the Blair Administration should have invested in nuclear. There is no doubt about that and I am perfectly happy to accept that point. We should have got into this business 10 years earlier, and we now find the Magnoxes being decommissioned and the EGRs, potentially, being decommissioned. We do not have time to replace that capacity quickly enough. At paragraph 3.5.9 of the EN-1 document, the Government say that they believe it is, "““realistic for new nuclear power stations to be operational in the UK from 2018, with deployment increasing as we move towards 2025””." That is welcome as a statement of a target but it does not say enough. Can the Government fill out that particular sentence? How many new nuclear power stations do they expect to be operational by 2018? We very badly need to know. When will those power stations start to contribute electricity to the grid? Can we have a little more detail on that? My second question relates to the further studies referred to in volume 1 of EN-6. I was able to get volume 2 only when I came into the Committee today. I tried yesterday in the Vote Office—if that is the right name for it—where you get papers, to get volume 2 and was told that it was not available. If I were still in the House of Commons, I would probably make a point of order on that. We do not make points of order here, so I cannot do so. I mention it in passing. Page 4 of the EN-6 refers to a whole lot of studies that will be required. Paragraph 1.6.5 says: "““Further studies will need to be carried out, as part of the project HRA and environmental impact assessment””," and then, in the following paragraph: "““Further studies will need to be carried out, as part of the project EIA process for individual development consent applications””." In the fourth paragraph within paragraph 1.6.5, it says: "““These issues will need to be considered in project level HRAs and EIAs””." The final sentence on the page is: "““The significance of these effects can only be determined through studies as part of the project level EIA and HRA””." We have a welter of new environmental studies to be undertaken. Are these going to be prerequisites for the granting of planning consent at the beginning of construction of these nuclear power stations and, if so, is that 2018 target at risk, or are the Government confident that whatever happens with these studies, that 2018 deadline—which is far too late in terms of the national interest but we have to do the best we can—will not be at risk? We need to have a clear, unambiguous answer on that. The third question for which I should be grateful for an answer relates to the whole issue of geological waste. Paragraph 2.11.3 on page 14 of EN-6 says: "““In reaching its view on the management and disposal of waste from new nuclear power stations the Government has in particular satisfied itself that … geological disposal of higher activity radioactive waste, including waste from new nuclear power stations, is technically achievable””." It may be technically achievable, and that is good news. We know that it is technically achievable because the Americans are investing in a major deep nuclear waste project, and the Finns are investing in one as well, in both cases in granite, and taking into account all the obvious risks. But what are the concrete plans from the Government for making progress in that area? I think that earlier I heard the Minister say that the intention was to have this deep nuclear waste storage facility in place by 2130. Did I hear him say that or did I mishear him?
Secondary information
- Type
- Proceeding contribution
- Reference
- 723 c160-2GC
- Session
- 2010-12
- Chamber / Committee
- House of Lords Grand Committee
- Subjects
- Cumbria Finance Environment protection Infrastructure Floods Kent Planning permission Planning Radioactive waste Nuclear power Nuclear fuel reprocessing Nuclear power stations Security Waste management Infrastructure Planning Commission National policy statements Mixed oxide fuel
- Link
- View this Proceeding contribution on www.publications.parliament.uk
Librarians' tools
- Timestamp
- 2025-05-18 08:18:23 +0100
- URI
- http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_700412
- In Indexing
- http://indexing.parliament.uk/Content/Edit/1?uri=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_700412
- In Solr
- https://search.parliament.uk/claw/solr/?id=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_700412