Skip to main content

1-7 of 7 results for subject:M5

Show detailed: On Off
Results: 10 20 50 100
Sort by: Newest first Oldest first

What was cost of construction of length of M5 between junctions 18 & 19. - The final account for construction work was settled in 1979 at a total cost of #11.9 million.

Asked by
Win Griffiths (Labour)
Answering body
Department of Transport
Type
Written questions
Status
Answered
Date
8 November 1988
Reference
140 c145W;140 c144W
House
House of Commons

To give latest available 24-hour traffic flow date for each link of the M1, M4 (in England) the M6, M25 & M5. - Will write.

Asked by
David Marshall (Labour)
Answering body
Department of Transport
Type
Written questions
Status
Answered
Date
22 July 1988
Reference
137 c888W;137 c874W
House
House of Commons

To comment on access to M5 motorway at junction 12

Asked by
Douglas French (Conservative)
Answering body
Department of Transport
Type
Written questions
Status
Answered
Date
11 July 1988
Reference
137 c88W;137 c89W
House
House of Commons

How many occasions since 1981 individual lanes of Bridgwater-Exeter section of M5 motorway have been closed for repair; & estimate how long each such lane closure lasted, excluding temporary lane closures resulting from road accidents; & what representations have been received since January 1987 re any inconvenience caused by such...

Asked by
David Nicholson (Conservative)
Answering body
Department of Transport
Type
Written questions
Status
Answered
Date
22 March 1988
Reference
130 c60-1W
House
House of Commons

If Sec of State plans to construct a fourth lane on M1 to act as a feeder into the M25. - No such proposals.

Asked by
Chris Butler (Conservative)
Answering body
Department of Transport
Type
Written questions
Status
Answered
Date
22 March 1988
Reference
130 c60W
House
House of Commons

What recent representations have been received in favour of improving road links between south Dorset & the M5.

Asked by
David Atkinson (Conservative)
Answering body
Department of Transport
Type
Written questions
Status
Answered
Date
1 February 1988
Reference
126 c498W
House
House of Commons

What is estimated cost of the present widening scheme for the M5 south of Birmingham.

Asked by
Simon Coombs (Conservative)
Answering body
Department of Transport
Type
Written questions
Status
Answered
Date
28 October 1987
Reference
121 c283W;121 c279W
House
House of Commons