1-20 of 30 results for subject:M4
Librarians' tools
- Search time
- 0.237 seconds
- Solr query time
- 0.002 seconds
- Search query
- subject:M4
- We searched for
- subject_t:M4 OR subject_ses:11458
Type
House
Session
More
Year
Department
Member
Primary member
Answering member
Legislative stage
Legislation
Subject
More
Publisher
If he has any plans to widen the M4 in Wales.
If he has any plans to widen the M4 in Wales.
When he expects construction work on the Baglan stretch of the M4 to be completed.
When he expects construction work on the Baglan stretch of the M4 to be completed.
If he will arrange for signposts on the M4 Motorway at suitable junctions to illustrate the direction to the town of Caldicot in the County of Gwent & consult with Gwent county council about erection of signposts on trunk roads to illustrate direction to Caldicot.
If he will arrange for signposts on the M4 Motorway at suitable junctions to illustrate the direction to the town of Caldicot in the County of Gwent & consult with Gwent county council about erection of signposts on trunk roads to illustrate direction to Caldicot.
When he expects to receive the final report of the M4/A4 corridor study from his consultants; what are the reasons for its delay; and when it will be published.
When he expects to receive the final report of the M4/A4 corridor study from his consultants; what are the reasons for its delay; and when it will be published.
What steps he is taking to minimise road works and the limitation on road lanes on the M4 for the remainder of the holiday period and particularly at weekends.
What steps he is taking to minimise road works and the limitation on road lanes on the M4 for the remainder of the holiday period and particularly at weekends.
How many fatal injuries have been recorded on the M4 in each of the last 10 years. - Inc figures. (Failed OPQ)
How many fatal injuries have been recorded on the M4 in each of the last 10 years. - Inc figures. (Failed OPQ)
What steps he proposes to take in co-operation with West Glamorgan County Council to protect pedestrians from objects falling from the Ynysforgan flyover of the M4 motorway. - Inc figure.
What steps he proposes to take in co-operation with West Glamorgan County Council to protect pedestrians from objects falling from the Ynysforgan flyover of the M4 motorway. - Inc figure.
Whether the matrix system on the M4 operates on GMT throughout the year. - No.
Whether the matrix system on the M4 operates on GMT throughout the year. - No.
If he will publish the criteria he has used to determine delaying the installation of temporary traffic lights at the Earlswood Roundabout until 1993.
If he will publish the criteria he has used to determine delaying the installation of temporary traffic lights at the Earlswood Roundabout until 1993.
What is the estimated total spending on major improvement schemes by his Department on (a) the A55 trunk road and (b) the M4 for each year since 1979. - Incls table.
What is the estimated total spending on major improvement schemes by his Department on (a) the A55 trunk road and (b) the M4 for each year since 1979. - Incls table.
At what time the 30 miles per hour and 60 miles per hour speed limits were switched on on the illuminated maximum speed indicators on the west-bound carriageway of the M4 motorway between junction 48 and the Pont Abraham services on the evening of Friday 19th April; at what time...
At what time the 30 miles per hour and 60 miles per hour speed limits were switched on on the illuminated maximum speed indicators on the west-bound carriageway of the M4 motorway between junction 48 and the Pont Abraham services on the evening of Friday 19th April; at what time...
When and what short-term measures are to be introduced to deal with the long delays experienced by traffic leaving Swansea at the Earlswood roundabout.
When and what short-term measures are to be introduced to deal with the long delays experienced by traffic leaving Swansea at the Earlswood roundabout.
Whether he has any plans to light the unlit section of the M4 motorway.
Whether he has any plans to light the unlit section of the M4 motorway.
If he will state the dates on which the two motorway signs on the westbound carriageway of the M4 Motorway at Junction 48 were damaged; and by when he proposes to have them repaired.
If he will state the dates on which the two motorway signs on the westbound carriageway of the M4 Motorway at Junction 48 were damaged; and by when he proposes to have them repaired.
If his Department will hold an inquiry into the causes of the multiple road accident on the M4 in Berkshire, between junctions 14 and 15 on Wednesday 13th March, including the significance of motorists ignoring the weather conditions; if he will indicate the weather conditions at the time and whether...
If his Department will hold an inquiry into the causes of the multiple road accident on the M4 in Berkshire, between junctions 14 and 15 on Wednesday 13th March, including the significance of motorists ignoring the weather conditions; if he will indicate the weather conditions at the time and whether...
What is his latest estimate of the date on which construction works for the widening of the M4 between the M25 and Swindon will start; and if he will comment on the progress of preliminary works.
What is his latest estimate of the date on which construction works for the widening of the M4 between the M25 and Swindon will start; and if he will comment on the progress of preliminary works.
Why there has been a delay in letting the contract for the bridge as part of the Loncas-Bagcan part of the M4; and how this will affect the date of the completion of the motorway. - Inc ref to "Roads in Wales: Progress & Plans for the 1990s" (in Library)...
Why there has been a delay in letting the contract for the bridge as part of the Loncas-Bagcan part of the M4; and how this will affect the date of the completion of the motorway. - Inc ref to "Roads in Wales: Progress & Plans for the 1990s" (in Library)...
If he will publish a table showing each of the trunk road improvement schemes in Wales scheduled to start between the current time and April 1994 and which will cost in excess of #1 million; and if he will indicate the order of priority of these schemes in relation to...
If he will publish a table showing each of the trunk road improvement schemes in Wales scheduled to start between the current time and April 1994 and which will cost in excess of #1 million; and if he will indicate the order of priority of these schemes in relation to...