1-4 of 4 results for subject:M4
Librarians' tools
- Search time
- 0.18 seconds
- Solr query time
- 0.001 seconds
- Search query
- subject:M4
- We searched for
- subject_t:M4 OR subject_ses:11458
Type
House
Session
More
Year
Department
Member
Primary member
Answering member
Legislative stage
Legislation
Subject
Publisher
Pursuant to his Answer of 12th March, Official Report, column 240W, on the Baglan Bridge, if he will take steps to provide facilities to segregate smaller vehicles on the occasions it is safe for them to use the bridge.
Pursuant to his Answer of 12th March, Official Report, column 240W, on the Baglan Bridge, if he will take steps to provide facilities to segregate smaller vehicles on the occasions it is safe for them to use the bridge.
SI 1997/847 (Negative instrument). Coming into force 21 July 1997.
SI 1997/847 (Negative instrument). Coming into force 21 July 1997.
On how many occasions Baglan Bridge on the M4 has been closed for all traffic in the last 12 months; what was the longest period of closure, and for what reasons it is necessary to include vehicles other than high-sided vehicles in the ban on traffic. - Inc figs.
On how many occasions Baglan Bridge on the M4 has been closed for all traffic in the last 12 months; what was the longest period of closure, and for what reasons it is necessary to include vehicles other than high-sided vehicles in the ban on traffic. - Inc figs.
How many kilometres of motorway are currently (a) open, (b) under construction, (c) planned in Wales, (i) as new motorway or (ii) as existing motorway being widened.
How many kilometres of motorway are currently (a) open, (b) under construction, (c) planned in Wales, (i) as new motorway or (ii) as existing motorway being widened.