1-6 of 6 results for subject:M25
Librarians' tools
- Search time
- 0.22 seconds
- Solr query time
- 0.003 seconds
- Search query
- subject:M25
- We searched for
- subject_t:M25 OR subject_ses:289702
Type
House
Session
More
Year
Department
Member
Primary member
Answering member
Legislative stage
Legislation
Subject
More
Publisher
To ask the Secretary of State for Transport, what steps he is taking to reduce noise on the M25 between junctions 10 and 11.
To ask the Secretary of State for Transport, what steps he is taking to reduce noise on the M25 between junctions 10 and 11.
Currently Highways England has a programme to replace the joints between the concrete slabs between junctions 9 and 11. This work is being done to ensure the road surface is maintained in good condition, but it should also help to reduce noise from the road surface.
Highways England is also carrying out trials to test materials and techniques which could help to reduce road noise from concrete surfacing on the M25 network. This trial is being carried out on the M1 motorway southbound between junctions 5 and 6.
This trial is due to finish in 2022 and the findings will be used to develop our long-term strategy for managing concrete road surfaces in the south east. The trial does include a period of accelerated testing on other parts of the strategic road network before 2022, and Highways England will keep this under review.
Highways England will monitor the condition and safety of the strategic network regularly and the surface of the M25 between junctions 10 and 11 is inspected weekly. Any safety critical defects will be repaired within 24 hours with a permanent repair completed within 28 days.
To ask Her Majesty's Government what assessment they have made of the decision by Highways England not to impose financial penalties on Connect Plus M25 Ltd for failing to meet contractual maintenance standards in the four-year period to June 2018.
To ask Her Majesty's Government what assessment they have made of the decision by Highways England not to impose financial penalties on Connect Plus M25 Ltd for failing to meet contractual maintenance standards in the four-year period to June 2018.
Highways England’s contract with Connect Plus M25 Ltd allows payment deductions to be made based on the measured condition of the road surface and the rectification of certain types of defects. During the four-year period to June 2018, payment deductions relating to the condition of the network and rectification of defects have been fully applied in accordance with the terms of the contract.
To ask Her Majesty's Government how many heavy goods vehicles that are less than 10 years old have suffered a tyre failure incident on the M25 motorway in the last six-month period for which data are available.
To ask Her Majesty's Government how many heavy goods vehicles that are less than 10 years old have suffered a tyre failure incident on the M25 motorway in the last six-month period for which data are available.
Neither Highways England, nor the Department, hold the detailed statistics requested. However, the Department recently launched a consultation on proposals to ban 10 year old tyres on certain vehicles, such as HGVs. I encourage all interested parties to provide feedback on the consultation.
The Department for Transport remains committed to improving safety on the Strategic Road Network and note that England’s roads are amongst the safest in Europe.
To ask the Secretary of State for Transport, what steps he is taking through Operation Brock to prepare for potential congestion around junctions 3, 4 and 5 of the M25 motorway as a result of disruption on the M20 and M26 in the event of the UK leaving the EU...
To ask the Secretary of State for Transport, what steps he is taking through Operation Brock to prepare for potential congestion around junctions 3, 4 and 5 of the M25 motorway as a result of disruption on the M20 and M26 in the event of the UK leaving the EU...
The plans for Operation Brock have been designed to keep traffic flowing in both directions on the M20 in the event of disruption to freight and other transport across the Channel. It would also thereby alleviate traffic congestion across the neighbouring strategic and local road network. The deployment of the M26 to queue Heavy Goods Vehicles (HGVs) temporarily will only be done in the unlikely event that capacity has been exceeded elsewhere under Brock contingency planning. The routes that HGVs will be directed to travel under Brock will be clearly signposted, and have been designed to minimise disruption on other roads, such as the M25, as much as possible.