To ask the Secretary of State for Defence, what progress he has made on the Submarine Waterfront Infrastructure Future programme in the context of the Delivery confidence assessments for Government Major Project Portfolio Defence projects.
To ask the Secretary of State for Defence, what progress he has made on the Submarine Waterfront Infrastructure Future programme in the context of the Delivery confidence assessments for Government Major Project Portfolio Defence projects.
The delivery confidence assessment for the Submarine Waterfront Infrastructure Future (SWIF) programme reflects the likelihood of successful delivery at a specific point in time and the National Infrastructure and Service Transformation Authority (NISTA) Gate Review process is an integral part of the Assurance Framework that the Ministry of Defence has in place to support project delivery.
Despite positive progress, there are still challenges to the delivery of the SWIF programme. The delivery team is working closely with NISTA and the contractor to recover the programme. The current focus is on the completion of design work, where we have increased the pace of design decisions and streamlined approvals, to enable the start of construction. We have used the principles set out in the Nuclear Regulatory Review as part of these reviews, to identify new opportunities to accelerate work.
To ask the Secretary of State for Defence, what progress he has made on the Submersible Ship Nuclear AUKUS programme in the context of the Delivery confidence assessments for Government Major Project Portfolio Defence projects.
To ask the Secretary of State for Defence, what progress he has made on the Submersible Ship Nuclear AUKUS programme in the context of the Delivery confidence assessments for Government Major Project Portfolio Defence projects.
The National Infrastructure and Service Transformation Authority Gate Review process is an integral part of the Assurance Framework that the Ministry of Defence has in place to support project delivery. The 2025-26 Government Major Project Portfolio amber assessment reflects the likelihood of successful delivery at a specific point in time and should be expected for a programme at this stage of maturity. We are making good progress in addressing the report’s findings.
The programme is currently midway through the Detailed Design and Long Lead (D2L2) phase which is due to complete in 2028. This will mature the design and manufacturing arrangements, develop detailed schedules and see the purchase of key long lead items for the early boats in Class.
On current plans, we will cut steel on the first SSN-AUKUS submarine next year, with the aim to deliver the first UK submarine into service from the late 2030s.
To ask the Secretary of State for Defence, what progress he has made on the Core Production Capability programme in the context of the Delivery confidence assessments for Government Major Project Portfolio Defence projects.
To ask the Secretary of State for Defence, what progress he has made on the Core Production Capability programme in the context of the Delivery confidence assessments for Government Major Project Portfolio Defence projects.
Delivery confidence assessments for Government Major Project Portfolio Defence projects published by National Infrastructure and Service Transformation Authority confirm that the Core Production Capability continues to make progress in delivering the infrastructure, workforce and manufacturing capabilities required to support our submarine programmes.
The major facility upgrades required to support Dreadnought reactor core production have been delivered, with activity now focused on completing final commissioning, manufacturing and delivering the reactor cores required.
The Ministry of Defence continues to work with Rolls-Royce Submarines to ensure delivery of reactor components in time to support Dreadnought entering service in the early 2030s as planned.
Work is also underway to modernise and expand the manufacturing capability and capacity required to produce reactor cores and nuclear steam raising plant for future SSN-AUKUS submarines, supporting both the UK and Australian submarine production programmes.
To ask the Secretary of State for Defence, what progress he has made on the Mechanised Infantry programme in the context of the Delivery confidence assessments for Government Major Project Portfolio Defence projects.
To ask the Secretary of State for Defence, what progress he has made on the Mechanised Infantry programme in the context of the Delivery confidence assessments for Government Major Project Portfolio Defence projects.
Delivery confidence assessments and programme performance summaries for all of the Government Major Projects are published in the NISTA Annual Report. Updates on performance and the latest delivery confidence assessments will next be provided from information captured on 31 March 2027.
To ask the Secretary of State for Defence, what progress he has made on the Land Environment Tactical Communication and Information Systems programme in the context of the Delivery confidence assessments for Government Major Project Portfolio Defence projects.
To ask the Secretary of State for Defence, what progress he has made on the Land Environment Tactical Communication and Information Systems programme in the context of the Delivery confidence assessments for Government Major Project Portfolio Defence projects.
Delivery confidence assessments and programme performance summaries for all of the Government Major Projects are published in the NISTA Annual Report. Updates on performance and the latest delivery confidence assessments will next be provided from information captured on 31 March 2027.
To ask the Secretary of State for Defence, what progress he has made on the Land Intelligence, Surveillance, Target Acquisition and Reconnaissance programme in the context of the Delivery confidence assessments for Government Major Project Portfolio Defence projects.
To ask the Secretary of State for Defence, what progress he has made on the Land Intelligence, Surveillance, Target Acquisition and Reconnaissance programme in the context of the Delivery confidence assessments for Government Major Project Portfolio Defence projects.
Delivery confidence assessments and programme performance summaries for all of the Government Major Projects are published in the NISTA Annual Report. Updates on performance and the latest delivery confidence assessments will next be provided from information captured on 31 March 2027.
To ask the Secretary of State for Defence, what progress he has made on the Skynet 6 programme in the context of the Delivery confidence assessments for Government Major Project Portfolio Defence projects.
To ask the Secretary of State for Defence, what progress he has made on the Skynet 6 programme in the context of the Delivery confidence assessments for Government Major Project Portfolio Defence projects.
Delivery confidence assessments and programme performance summaries for all of the Government Major Projects are published in the NISTA Annual Report. Updates on performance and the latest delivery confidence assessments will next be provided from information captured on 31 March 2027.
To ask the Secretary of State for Defence, what progress he has made on the Ground Based Air Defence programme in the context of the Delivery confidence assessments for Government Major Project Portfolio Defence projects.
To ask the Secretary of State for Defence, what progress he has made on the Ground Based Air Defence programme in the context of the Delivery confidence assessments for Government Major Project Portfolio Defence projects.
Delivery confidence assessments and programme performance summaries for all of the Government Major Projects are published in the NISTA Annual Report. Updates on performance and the latest delivery confidence assessments will next be provided from information captured on 31 March 2027.
To ask the Secretary of State for Defence, when he expects his Department’s review of Single Living Accommodation to report.
To ask the Secretary of State for Defence, when he expects his Department’s review of Single Living Accommodation to report.
The independent Single Living Accommodation (SLA) review has been examining the provision and management of SLA across the UK estate. The review is expected to report this Autumn.
To ask the Secretary of State for Defence, what the average time is between damp and mould being reported in Single Living Accommodation and works being completed to rectify it.
To ask the Secretary of State for Defence, what the average time is between damp and mould being reported in Single Living Accommodation and works being completed to rectify it.
As of 23 October 2026, the average time between damp and mould being reported in Single Living Accommodation and works being completed was 20.94 days.
To ask the Secretary of State for Defence, what information his Department holds on the number of service family accommodation and single living accommodation for military personnel that do not meet the Decent Homes Standard.
To ask the Secretary of State for Defence, what information his Department holds on the number of service family accommodation and single living accommodation for military personnel that do not meet the Decent Homes Standard.
As of 23 October 2026, of the 47,173 Service Family Accommodation (SFA) properties maintained by the Ministry of Defence (MOD), circa 2% were assessed as falling below the Decent Homes Standard (DHS), while circa 98% met or exceeded the DHS Standard.
Under the plans set out in the Defence Housing Strategy, nine in 10 Defence homes will be modernised or upgraded, including over 10,000 homes that will be substantially refurbished or replaced through major renovation or new build programmes. This will be supported by £9.2 billion of investment over the next decade and delivered through the Defence Housing Service.
SFA that is graded DH- is not allocated to families when they apply for SFA, but homes may be downgraded to this standard during occupancy.
Single Living Accommodation (SLA) is not assessed against the DHS. Defence has introduced its own Defence Minimum Standard (DMS) that applies the intent of the Decent Homes Standard but considers the unique nature of SLA.
The SLA estate was last assessed against the DMS in 2023, and 72% of SLA met or exceeded DMS.
The Government is committed to improving the living conditions of Service Personnel. The Defence Investment Plan includes £1.4 billion over this Parliament for SLA, supporting the modernisation of accommodation and improvements to living standards across the Defence estate.
A review into Single Unaccompanied Living Accommodation has been undertaken and is pending finalisation.
To ask the Secretary of State for Defence, what information his Department holds on the number of call-outs for urgent repairs to single living accommodation for military personnel since 1 January 2026.
To ask the Secretary of State for Defence, what information his Department holds on the number of call-outs for urgent repairs to single living accommodation for military personnel since 1 January 2026.
As of 23 October 2026, there have been 31,540 urgent reactive work call-outs to Single Living Accommodation since 1 January 2026.
To ask the Secretary of State for Defence, how many service personnel are currently living in Single Living Accommodation, and what that figure has been in each of the last ten years.
To ask the Secretary of State for Defence, how many service personnel are currently living in Single Living Accommodation, and what that figure has been in each of the last ten years.
As at 23 October 2026, 82,157 Service personnel were recorded as occupying permanent Single Living Accommodation (SLA).
The equivalent point-in-time figures as at 23 October for each of the previous ten calendar years, together with the number of Service personnel recorded as occupying SLA at any point during the respective calendar year, are shown below.
Year | As at 23 October | Full Calendar Year |
2016 | 81,218 | 101,067 |
2017 | 80,650 | 99,642 |
2018 | 78,303 | 97,163 |
2019 | 80,450 | 99,933 |
2020 | 82,305 | 101,368 |
2021 | 84,881 | 103,613 |
2022 | 81,888 | 101,980 |
2023 | 79,461 | 97,457 |
2024 | 77,582 | 96,217 |
2025 | 80,003 | 96,976 |
To ask the Secretary of State for Defence, how much does his Department plan on spending on Single Living Accommodation in this Parliament.
To ask the Secretary of State for Defence, how much does his Department plan on spending on Single Living Accommodation in this Parliament.
The Government is committed to improving the living conditions of Service personnel. The Defence Investment Plan includes £1.4 billion over this Parliament for Single Living Accommodation, supporting the modernisation of accommodation and improvements to living standards across the Defence estate.
Accommodation improvements are being delivered through a number of programmes, including Defence Estate Optimisation, Future Defence Infrastructure Services, and the SLA Framework Alliance, which are now moving into major delivery phases.
Defence launched an independent Single Living Accommodation and Overseas Estate Review in January 2026 to identify further opportunities to improve the lived experience of Service personnel and ensure accommodation better supports capability and retention scheduled to report Autumn 2026.
Alongside accommodation investment, the Department is continuing to implement the Defence Catering Strategy to improve food quality, dining facilities and the overall experience of personnel living and working on the Defence estate.
To ask the Secretary of State for Defence, what the capital expenditure on Single Living Accommodation was in each financial year from 2015-16 to 2024-25.
To ask the Secretary of State for Defence, what the capital expenditure on Single Living Accommodation was in each financial year from 2015-16 to 2024-25.
Capital expenditure on Single Living Accommodation for each Financial Year (FY) from FY2018-19 to FY2024-25 is provided in the table below:
£million | FY 18/19 | FY 19/20 | FY 20/21 | FY 21/22 | FY 22/23 | FY 23/24 | FY 24/25 |
117.894 | 88.104 | 61.729 | 81.125 | 117.405 | 233.229 | 299.478 |
Data prior to financial year 2018-19 is incomplete.
To ask the Secretary of State for Defence, pursuant to the Answer of 16 July 2026 to Question 18377 on Armed Forces: Housing, when will independent review into single living accommodation will conclude.
To ask the Secretary of State for Defence, pursuant to the Answer of 16 July 2026 to Question 18377 on Armed Forces: Housing, when will independent review into single living accommodation will conclude.
The independent Single Living Accommodation (SLA) review has been examining the provision and management of SLA across the UK estate. The review is expected to report this Autumn.
To ask the Secretary of State for Defence, what discussions he has made with officials and ministerial colleagues about the possibility of a civilian volunteer reserve, supported with non-military training.
To ask the Secretary of State for Defence, what discussions he has made with officials and ministerial colleagues about the possibility of a civilian volunteer reserve, supported with non-military training.
The 2025 Strategic Defence Review makes clear the importance of a whole-of-society approach to the UK’s security and resilience. The Cabinet Office led Home Defence Programme is undertaking a range of home defence planning across government, including efforts to ensure alignment between military and civilian effort in a period of international hostilities affecting the UK.
To ask the Secretary of State for Defence, what the estimated maintenance backlog is for Single Living Accommodation.
To ask the Secretary of State for Defence, what the estimated maintenance backlog is for Single Living Accommodation.
The definition of maintenance backlog is the identified maintenance works, required to restore the condition of a built asset to a defined satisfactory standard at a specific point in time, but has not yet been carried out. The number of maintenance backlog works for Single Living Accommodation (SLA) can only be provided at disproportionate cost.
The number of Service Personnel currently occupying SLA awaiting refurbishment or improvement works or longest wating time for such work can only be provided at disproportionate cost.
There are currently 43 SLA buildings scheduled for refurbishment. An average length of delay cannot be provided, as a number of these works do not have a scheduled start date.
The Department does not hold a figure for the number of SLA units awaiting unscheduled repairs. When a repair is reported through the helpdesk, it is scheduled in accordance with contractual requirements. There is no separate waiting list for unscheduled repairs.
To ask the Secretary of State for Defence, what information his Department holds on the number of single living accommodation units for military personnel that are on the waiting list for unscheduled repairs.
To ask the Secretary of State for Defence, what information his Department holds on the number of single living accommodation units for military personnel that are on the waiting list for unscheduled repairs.
The definition of maintenance backlog is the identified maintenance works, required to restore the condition of a built asset to a defined satisfactory standard at a specific point in time, but has not yet been carried out. The number of maintenance backlog works for Single Living Accommodation (SLA) can only be provided at disproportionate cost.
The number of Service Personnel currently occupying SLA awaiting refurbishment or improvement works or longest wating time for such work can only be provided at disproportionate cost.
There are currently 43 SLA buildings scheduled for refurbishment. An average length of delay cannot be provided, as a number of these works do not have a scheduled start date.
The Department does not hold a figure for the number of SLA units awaiting unscheduled repairs. When a repair is reported through the helpdesk, it is scheduled in accordance with contractual requirements. There is no separate waiting list for unscheduled repairs.
To ask the Secretary of State for Defence, what is the longest outstanding waiting time for service personnel living in Single Living Accommodation seeking refurbishment or improvement works.
To ask the Secretary of State for Defence, what is the longest outstanding waiting time for service personnel living in Single Living Accommodation seeking refurbishment or improvement works.
The definition of maintenance backlog is the identified maintenance works, required to restore the condition of a built asset to a defined satisfactory standard at a specific point in time, but has not yet been carried out. The number of maintenance backlog works for Single Living Accommodation (SLA) can only be provided at disproportionate cost.
The number of Service Personnel currently occupying SLA awaiting refurbishment or improvement works or longest wating time for such work can only be provided at disproportionate cost.
There are currently 43 SLA buildings scheduled for refurbishment. An average length of delay cannot be provided, as a number of these works do not have a scheduled start date.
The Department does not hold a figure for the number of SLA units awaiting unscheduled repairs. When a repair is reported through the helpdesk, it is scheduled in accordance with contractual requirements. There is no separate waiting list for unscheduled repairs.