1-1 of 1 results for subject:"Signalling Control UK"
Librarians' tools
- Search time
- 0.191 seconds
- Solr query time
- 0.0 seconds
- Search query
- subject:"Signalling Control UK"
- We searched for
- subject_t:"Signalling Control UK" OR subject_ses:70185
Type
House
Session
Year
Department
Member
Primary member
Answering member
Legislative stage
Legislation
Subject
Publisher
If he will set out the current timetable for privatising (a) Railtrack, (b) British Rail's Infrastructure Maintenance Units, (c) British Rail's Track Renewal Units, (d) Signalling Control UK, (e) Interlogic Control Engineering and (f) British Rail Telecoms.
If he will set out the current timetable for privatising (a) Railtrack, (b) British Rail's Infrastructure Maintenance Units, (c) British Rail's Track Renewal Units, (d) Signalling Control UK, (e) Interlogic Control Engineering and (f) British Rail Telecoms.
Asked by
Hugh Bayley
(Labour)
Answered by
John Watts
(Conservative)
Answering body
Department of Transport
Type
Written questions
Status
Answered
For answer on
30 June 1995
Answered on
30 June 1995
Subjects
British Rail; Privatisation; Railways; Railtrack; Interlogic Control Engineering; Signalling Control UK; British Rail Telecommunications
Date
30 June 1995
Reference
262 c807W
House
House of Commons