1-7 of 7 results for subject:Dungiven
Librarians' tools
- Search time
- 0.219 seconds
- Solr query time
- 0.001 seconds
- Search query
- subject:Dungiven
- We searched for
- subject_t:Dungiven
Type
House
Session
Year
Department
Member
Primary member
Answering member
Legislative stage
Legislation
Subject
Publisher
asked Her Majesty's Government:What plans they have to improve traffic flow through Dungiven in County Londonderry.
asked Her Majesty's Government:What plans they have to improve traffic flow through Dungiven in County Londonderry.
What proposals he has for a bypass at (a) Dungiven and (b) Strabane.
What proposals he has for a bypass at (a) Dungiven and (b) Strabane.
When he now expects work to begin on the Dungiven by-pass. - The Dungiven bypass is not included in the Depts current 5-year major road works programme.
When he now expects work to begin on the Dungiven by-pass. - The Dungiven bypass is not included in the Depts current 5-year major road works programme.
If he will publish a table to show for (a) the Roe Bridge, Limavady and (b) the Roe Bridge, Dungiven, the number of vehicles per day, the highest hourly flow and the lowest hourly flow; and how many of those vehicles are in each case in each category used in...
If he will publish a table to show for (a) the Roe Bridge, Limavady and (b) the Roe Bridge, Dungiven, the number of vehicles per day, the highest hourly flow and the lowest hourly flow; and how many of those vehicles are in each case in each category used in...
To give consideration to using former US navy base at Benbradagh mountain at Dungiven, County Londonderry, as a site for radar installation currently proposed for Brawdy, Pembrokeshire
To give consideration to using former US navy base at Benbradagh mountain at Dungiven, County Londonderry, as a site for radar installation currently proposed for Brawdy, Pembrokeshire
Table showing number of vehicles which cross Roe bridge at Limavady, & number of vehicles which cross Roe bridge at Dungiven, each day & number of such vehicles which are believed to be heavy commercial vehicles; & also highest & lowest hourly traffic flows. - (Holding answer 9 Jan 1990).
Table showing number of vehicles which cross Roe bridge at Limavady, & number of vehicles which cross Roe bridge at Dungiven, each day & number of such vehicles which are believed to be heavy commercial vehicles; & also highest & lowest hourly traffic flows. - (Holding answer 9 Jan 1990).
If there is now a start date for the Dungivien bypass; what is present estimated cost; & what was original estimated cost. - Figures given. (Holding answer 16 Feb 1988)
If there is now a start date for the Dungivien bypass; what is present estimated cost; & what was original estimated cost. - Figures given. (Holding answer 16 Feb 1988)