1-20 of 201 results for subject:M3
Librarians' tools
- Search time
- 0.382 seconds
- Solr query time
- 0.003 seconds
- Search query
- subject:M3
- We searched for
- subject_t:M3 OR subject_ses:11457
Type
House
Session
Year
Department
Member
More
Primary member
More
Answering member
More
Legislative stage
Legislation
Subject
More
Publisher
To ask the Secretary of State for Transport, what steps her Department has taken to reduce congestion at the meeting of the A322 with the M3 Junction 3 in Surrey Heath constituency.
To ask the Secretary of State for Transport, what steps her Department has taken to reduce congestion at the meeting of the A322 with the M3 Junction 3 in Surrey Heath constituency.
National Highways undertook an early-stage study of the M3 junction 3 in 2023. As well as a long-term large-scale enhancement to address both congestion and incidents, it is considering smaller, tactical solutions that can be delivered in the short-term. It is commencing a feasibility study on small-scale improvements, working closely with Surrey County Council who are responsible for the A322. This work will form the evidence base for potential future enhancements to be delivered during RIS3, beyond 2026.
To ask the Secretary of State for Transport, if Ministers in her Department will meet with the hon. Member for Surrey Heath to discuss national infrastructure improvements where the A322 meets the M3 Junction 3.
To ask the Secretary of State for Transport, if Ministers in her Department will meet with the hon. Member for Surrey Heath to discuss national infrastructure improvements where the A322 meets the M3 Junction 3.
I would be happy to meet to discuss potential improvements to this junction and surrounding roads as the Minister responsible for this matter.
To ask the Secretary of State for Transport, if he will make an assessment of the potential merits of introducing a pilot scheme for an 80mph motorway on the (a) M3, (b) M4 and (c) M6 toll road.
To ask the Secretary of State for Transport, if he will make an assessment of the potential merits of introducing a pilot scheme for an 80mph motorway on the (a) M3, (b) M4 and (c) M6 toll road.
We have no plans to do so at present but keep this issue under close review.
To ask the Secretary of State for Transport, if his Department will undertake further works to the M3 and M4 smart motorways to provide additional services and facilities for drivers such as lay-bys.
To ask the Secretary of State for Transport, if his Department will undertake further works to the M3 and M4 smart motorways to provide additional services and facilities for drivers such as lay-bys.
The Government recognises the important role that Motorway Service Areas (MSAs) play in providing a safe place for motorists to stop and rest. Government policy on the location of MSAs is detailed in Department for Transport Circular 01/2022 ‘Strategic Road Network and the delivery of sustainable development’.
The Government has also committed £390m to a programme to deliver 150 additional Emergency Areas on All Lane Running (ALR) smart motorways over the duration of the second Road Investment Strategy (2020-25).
To ask the Secretary of State for Transport, what steps his Department is taking to improve the A30 as a secondary route for the M3.
To ask the Secretary of State for Transport, what steps his Department is taking to improve the A30 as a secondary route for the M3.
It would be for Hampshire County Council as the Local Highway Authority to bring forward a proposal at the next funding opportunity and to argue its case in whatever selection process is agreed upon.
To ask the Secretary of State for Transport, for what reason the A316 from Junction 1 of the M3 to the Whitton Road roundabout has speed limits of 40mph and 50mph.
To ask the Secretary of State for Transport, for what reason the A316 from Junction 1 of the M3 to the Whitton Road roundabout has speed limits of 40mph and 50mph.
The M3 junction 1 is at the edge of the Greater London Authority boundary. The responsibility for managing London's road network is shared between Transport for London (TfL) and the London boroughs.
Local authorities have the power to set speed limits on their roads. They have the local knowledge making them the best placed to do so.
To ask the Secretary of State for Transport, what steps his Department is taking to improve access to London from the M3 at Junction 1 (a) along the A316 and (b) by other routes.
To ask the Secretary of State for Transport, what steps his Department is taking to improve access to London from the M3 at Junction 1 (a) along the A316 and (b) by other routes.
The M3 junction 1 is at the edge of the Greater London Authority boundary. The A316 and other routes from the motorway into London are part of London’s road network, the responsibility for managing London's road network is shared between Transport for London (TfL) and the London boroughs.
To ask the Secretary of State for Transport, for what reasons the M3 westbound speed limit is 50mph at Junction 2; and for what reason the carriageway is reduced to one lane at that junction.
To ask the Secretary of State for Transport, for what reasons the M3 westbound speed limit is 50mph at Junction 2; and for what reason the carriageway is reduced to one lane at that junction.
There is only a single lane coastbound through M3 Junction 2. The speed limit is permanently reduced to 50mph to allow slow moving vehicles, such as heavy goods vehicles and vehicles towing trailers, to safely move into and out of lane 3 either side of the junction.
The traffic flows at this junction are unusual with a very low traffic flow through the junction on the M3 but with very high traffic flows joining the coastbound M3 from the M25. The layout of the junction allows these uneven traffic flows to be accommodated with the minimum of delays for road users of both motorways.
To ask the Secretary of State for Transport, what steps he is taking to ensure road users are informed of how safely to act in the event of a breakdown on smart motorways on (a) the M27 between J4 and J11 and (b) part of the M3 between J9 and...
To ask the Secretary of State for Transport, what steps he is taking to ensure road users are informed of how safely to act in the event of a breakdown on smart motorways on (a) the M27 between J4 and J11 and (b) part of the M3 between J9 and...
Highways England runs regular national public information campaigns to help improve driver confidence and safety when using the Strategic Road Network (SRN). Detailed advice about safe driving on Englandâs motorways and major A-roads is available on its website www.highwaysengland.co.uk/motorways.
Since 2016, Highways England has run eight national smart motorways public awareness campaigns. Last Summer and again in February this year, it ran national public awareness campaigns on how to drive safely on its motorways, including messaging on what to do in a breakdown and smart motorway features, including Red X and variable speed limits. Highways England will continue to deliver national public awareness campaigns, with the next one planned for later this year on what to do in the event of a breakdown.
More widely, my Rt Hon Friend the Secretary of State commissioned a review into smart motorway safety which reported earlier this year, with 18 measures to raise the bar on smart motorway safety, notwithstanding that the evidence shows that in most ways, smart motorways are as safe as, or safer than, the conventional ones. These measures included committing to an additional £5million on national targeted communications campaigns to further increase awareness and understanding of smart motorways, how they work and how to use them confidently.
Highways England is delivering a number of communications activities for the M27 Junction 4 to 11 Smart Motorway Scheme ahead of opening to help customers understand how to safely use a smart motorway. These include local exhibition events at community centres along the length of the scheme, information points at shopping centres, and the creation of scheme specific newsletters as well as information leaflets. Local authorities and other key stakeholders are also encouraged to share information using their own communication channels. Highways England expects to follow a similar communication strategy for the M3 scheme.
The M27 Junction 4 to 11 Smart Motorway Scheme will utilise variable mandatory speed limits (VMSL) which are set automatically in response to the level of congestion or traffic queues. Sensors detect the speed and volume of traffic, and this is used to calculate the optimum speed to keep vehicles moving smoothly, reducing the level of stop-start traffic and congestion.
The M3 Junctions 9 to 14 Smart Motorway Scheme is also planned to operate with VMSLs following a consultation, in which there was no opposition to the specifics of implementing VMSL.
To ask the Secretary of State for Transport, what assessment he has made of the potential effect on the safety of road users of implementing fixed safe speed restrictions at high-risk points on smart motorways on (a) the M27 between J4 and J11 and (b) part of the M3 between...
To ask the Secretary of State for Transport, what assessment he has made of the potential effect on the safety of road users of implementing fixed safe speed restrictions at high-risk points on smart motorways on (a) the M27 between J4 and J11 and (b) part of the M3 between...
Highways England runs regular national public information campaigns to help improve driver confidence and safety when using the Strategic Road Network (SRN). Detailed advice about safe driving on Englandâs motorways and major A-roads is available on its website www.highwaysengland.co.uk/motorways.
Since 2016, Highways England has run eight national smart motorways public awareness campaigns. Last Summer and again in February this year, it ran national public awareness campaigns on how to drive safely on its motorways, including messaging on what to do in a breakdown and smart motorway features, including Red X and variable speed limits. Highways England will continue to deliver national public awareness campaigns, with the next one planned for later this year on what to do in the event of a breakdown.
More widely, my Rt Hon Friend the Secretary of State commissioned a review into smart motorway safety which reported earlier this year, with 18 measures to raise the bar on smart motorway safety, notwithstanding that the evidence shows that in most ways, smart motorways are as safe as, or safer than, the conventional ones. These measures included committing to an additional £5million on national targeted communications campaigns to further increase awareness and understanding of smart motorways, how they work and how to use them confidently.
Highways England is delivering a number of communications activities for the M27 Junction 4 to 11 Smart Motorway Scheme ahead of opening to help customers understand how to safely use a smart motorway. These include local exhibition events at community centres along the length of the scheme, information points at shopping centres, and the creation of scheme specific newsletters as well as information leaflets. Local authorities and other key stakeholders are also encouraged to share information using their own communication channels. Highways England expects to follow a similar communication strategy for the M3 scheme.
The M27 Junction 4 to 11 Smart Motorway Scheme will utilise variable mandatory speed limits (VMSL) which are set automatically in response to the level of congestion or traffic queues. Sensors detect the speed and volume of traffic, and this is used to calculate the optimum speed to keep vehicles moving smoothly, reducing the level of stop-start traffic and congestion.
The M3 Junctions 9 to 14 Smart Motorway Scheme is also planned to operate with VMSLs following a consultation, in which there was no opposition to the specifics of implementing VMSL.
To ask the Secretary of State for Transport, what steps he is taking to ensure that road users are informed of how safely to use smart motorways on (a) the M27 between J4 and J11 and (b) part of the M3 between J9 and J14 prior to their opening.
To ask the Secretary of State for Transport, what steps he is taking to ensure that road users are informed of how safely to use smart motorways on (a) the M27 between J4 and J11 and (b) part of the M3 between J9 and J14 prior to their opening.
Highways England runs regular national public information campaigns to help improve driver confidence and safety when using the Strategic Road Network (SRN). Detailed advice about safe driving on Englandâs motorways and major A-roads is available on its website www.highwaysengland.co.uk/motorways.
Since 2016, Highways England has run eight national smart motorways public awareness campaigns. Last Summer and again in February this year, it ran national public awareness campaigns on how to drive safely on its motorways, including messaging on what to do in a breakdown and smart motorway features, including Red X and variable speed limits. Highways England will continue to deliver national public awareness campaigns, with the next one planned for later this year on what to do in the event of a breakdown.
More widely, my Rt Hon Friend the Secretary of State commissioned a review into smart motorway safety which reported earlier this year, with 18 measures to raise the bar on smart motorway safety, notwithstanding that the evidence shows that in most ways, smart motorways are as safe as, or safer than, the conventional ones. These measures included committing to an additional £5million on national targeted communications campaigns to further increase awareness and understanding of smart motorways, how they work and how to use them confidently.
Highways England is delivering a number of communications activities for the M27 Junction 4 to 11 Smart Motorway Scheme ahead of opening to help customers understand how to safely use a smart motorway. These include local exhibition events at community centres along the length of the scheme, information points at shopping centres, and the creation of scheme specific newsletters as well as information leaflets. Local authorities and other key stakeholders are also encouraged to share information using their own communication channels. Highways England expects to follow a similar communication strategy for the M3 scheme.
The M27 Junction 4 to 11 Smart Motorway Scheme will utilise variable mandatory speed limits (VMSL) which are set automatically in response to the level of congestion or traffic queues. Sensors detect the speed and volume of traffic, and this is used to calculate the optimum speed to keep vehicles moving smoothly, reducing the level of stop-start traffic and congestion.
The M3 Junctions 9 to 14 Smart Motorway Scheme is also planned to operate with VMSLs following a consultation, in which there was no opposition to the specifics of implementing VMSL.
Basingstoke Motorway Service Areas
The petition of residents of Basingstoke,
Declares that urgent action must be taken concerning proposals for new Motorway Service Areas at Basingstoke; further that there is no need for any additional motorway service areas given that the existing services at Fleet and Winchester are only 23 miles apart;...
Basingstoke Motorway Service Areas
The petition of residents of Basingstoke,
Declares that urgent action must be taken concerning proposals for new Motorway Service Areas at Basingstoke; further that there is no need for any additional motorway service areas given that the existing services at Fleet and Winchester are only 23 miles apart;...
Basingstoke Motorway Service Areas
I rise to present this petition, which, with over 3,000 signatures, clearly demonstrates the strength of opposition to proposals for two separate motorway service areas in Basingstoke, at junction 6 and at a site near Hatch Warren next to junction 7. If both were to go ahead,...
Basingstoke Motorway Service Areas
I rise to present this petition, which, with over 3,000 signatures, clearly demonstrates the strength of opposition to proposals for two separate motorway service areas in Basingstoke, at junction 6 and at a site near Hatch Warren next to junction 7. If both were to go ahead,...
I rise to present this petition, which, with over 3,000 signatures, clearly demonstrates the strength of opposition to proposals for two separate motorway service areas in Basingstoke, at junction 6 and at a site near Hatch Warren next to junction 7. If both were to go ahead, this would mean...
I rise to present this petition, which, with over 3,000 signatures, clearly demonstrates the strength of opposition to proposals for two separate motorway service areas in Basingstoke, at junction 6 and at a site near Hatch Warren next to junction 7. If both were to go ahead, this would mean...
To ask Her Majesty's Government when they expect Woodlands Lane Bridge over the M3 motorway at Windlesham to re-open.
To ask Her Majesty's Government when they expect Woodlands Lane Bridge over the M3 motorway at Windlesham to re-open.
Woodlands Bridge, near junction 3 of the M3, has been rebuilt by Highways England as part of the project to upgrade the M3 to a smart motorway. The bridge had been closed to traffic since October 2016 and reopened on Friday 22nd December 2017.
Is there an end to M3 night closures?
Is there an end to M3 night closures?
As my right hon. Friend will know, these are night closures because of the protections being offered to daytime running. Upgrading of smart motorway junctions has already taken place—junctions 2
to 4 are complete, and work on junction 6 is due to complete soon. Other work on junctions 9 and 14 is planned, but it has not yet commenced.
As my right hon. Friend will know, these are night closures because of the protections being offered to daytime running. Upgrading of smart motorway junctions has already taken place—junctions 2
to 4 are complete, and work on junction 6 is due to complete soon. Other work on junctions 9 and 14 is planned, but it has not yet commenced.
As my right hon. Friend will know, these are night closures because of the protections being offered to daytime running. Upgrading of smart motorway junctions has already taken place—junctions 2
to 4 are complete, and work on junction 6 is due to complete soon. Other work on junctions 9 and 14 is planned, but it has not yet commenced.
Is there an end to M3 night closures?
Her Majesty's Government what assessment they have made of the progress of the roadworks on the M3 motorway between junctions 2 and 4a; and when they expect those works to be completed.
Her Majesty's Government what assessment they have made of the progress of the roadworks on the M3 motorway between junctions 2 and 4a; and when they expect those works to be completed.
Highways England is on schedule to open the M3 Smart Motorway between junctions 2 and 4a on 30 June 2017.
Alongside the delivery of this Smart Motorways scheme Highways England have also undertaken additional planned maintenance and renewal of a large amount of existing infrastructure reducing the need for further roadworks. This has included full low noise resurfacing of the carriageways. Highways England has delivered most of this work in parallel, there will be some remaining works which will need to take place beyond the 30 June 2017.
To ask Her Majesty’s Government for how many months roadworks have been underway on the M3 motorway between the Fleet Services and the M25; for how many months those roadworks are expected to continue; what was the initial cost estimate for those works; and what is the current estimated cost.
To ask Her Majesty’s Government for how many months roadworks have been underway on the M3 motorway between the Fleet Services and the M25; for how many months those roadworks are expected to continue; what was the initial cost estimate for those works; and what is the current estimated cost.
The roadworks underway on the M3 between junctions 2 (the M25) and 4a near Fleet services) consist of two combined schemes (a Smart Motorway scheme and a maintenance scheme). These have been underway for 26 months, and are currently due to finish construction in two months in June 2017. The cost estimate approved for these works was £256 million. The current estimated outturn cost of the scheme is also £256 million.