Deposited paper deposited in the House of Commons by the Department of Energy and Climate Change and PB Power on Thursday, 2 February 2012. The commitment to deposit was made on Tuesday, 31 January 2012.
Deposited Paper DEP2012-0188
I. Electricity transmission costing study: an independent report endorsed by the Institution of Engineering and Technology. 140 p. II. Electricity transmission costing study: an independent report endorsed by the Institution of Engineering and Technology. Appendices. 194 p.
Secondary information
- Type
- Deposited paper
- Reference
- DEP2012-0188
- Originated on
- Tuesday, 31 January 2012
- Author
- Department of Energy and Climate Change
- PB Power
- Related items
- Subjects
- Costs Electricity Infrastructure Electric cables Planning permission Technology Research Institution of Engineering and Technology
- Contains statistics
- Yes
Librarians' tools
- Timestamp
- 2019-12-27 21:47:15 +0000
- URI
- http://data.parliament.uk/depositedpapers/2269770
- In Indexing
- http://indexing.parliament.uk/Content/Edit/1?uri=http://data.parliament.uk/depositedpapers/2269770
- In Solr
- https://search.parliament.uk/claw/solr/?id=http://data.parliament.uk/depositedpapers/2269770
- Internal location
- https://admin.depositedpapers.parliament.uk/depositedpaper/view/2269770