Written question asked by Lord Marlesford (Conservative), in the House of Lords. It was answered by Lord Adonis (Labour) on Tuesday, 10 November 2009.


Bats

Question
To ask Her Majesty's Government over which roads the Highways Agency has constructed bridges for bats in each of the past five years; and what was the cost of each such bridge.
Answer

The Highways Agency has constructed structures that enable bats to cross roads at four locations. The table below highlights the locations, length and costs of these structures.

Bat structures designed and constructed between 2004 and 2009
Scheme Name Road Number Road opened Approx Length of Structure (metres) Single or Dual Carriageway Cutting/Embankment/At Grade Approx Construction Cost of Structure
Dobwalls 2 Structures A38 June 2008 Structure 1—59.47m Structure 2—70m Dual At Grade/In Cutting £300,000.00
Haydon Bridge A69 April 2009 19.5m between support posts Single In cutting £60,000.00
High and Low Newton A590 April 2008 33m span between timber supporting posts Dual In cutting £45,000.00
Parton to Lillyhall A595 Dec 2008 34m span between supporting steel structures Dual On embankment £34,133.00

Secondary information

Type
Written question
Reference
6160; 714 c126WA
Session
2008-09
Subjects
Construction Bridges Expenditure Highways Agency Nature conservation Roads Bats
Link
View this Written question on www.publications.parliament.uk