Written question asked by Mike Hancock (Liberal Democrat) on Tuesday, 7 March 2000, in the House of Commons. It was due for an answer on Wednesday, 22 March 2000. It was answered by Lord Moonie (Labour) on Wednesday, 22 March 2000 on behalf of the Ministry of Defence.


Ministry of Defence;Defence Procurement Agency

Question
To ask the Secretary of State for Defence, what the results were of the phase 1 testing of the remote minefield detection system; what is his estimate of the total cost of the system; and if he will make a statement. - Includes figure and ref to text of letter from Sir Robert Walmsley of DPA.
Answer

Mr. Hancock: To ask the Secretary of State for Defence what the results were of the phase 1 testing of the remote minefield detection system; what is his estimate of the total cost of the system; and if he will make a statement. [113904] Dr. Moonie: This is a matter for the Chief Executive of the Defence Procurement Agency. I have asked the Chief Executive to write to the hon. Member. Letter from Sir Robert Walmsley to Mr. Mike Hancock, dated 22 March 2000: I am replying to your question to the Secretary of State for Defence about the result of the phase 1 testing of the remote minefield detection system and the estimate of the total cost of the system. This letter falls within my area of responsibility as Chief of Defence Procurement and Chief Executive of the Defence Procurement Agency. The aim of phase 1 of the remote minefield detection system Technology Demonstration Programme (TDP) was to evaluate a number of remote sensing technologies. Five emerging technologies were investigated over a ten month period for applicability to the remote minefield detection role. Following feasibility studies a formal sensor selection methodology recommended as Infrared Polarimetric Camera (IPRC) coupled with Ultra WideBand Synthetic Aperture Radar (UWB SAR) as the best complimentary combination. Other technologies were discarded as being too immature, poorly performing, or impractical for airborne operations. Phase 2, which began in November 1996, covers the detailed design and build of the sensors. The cost of phase 1 of the TDP was some £411k. The technology is still at a very early stage and, as a consequence, it is too early to estimate the potential cost of any resulting system.


Secondary information

Type
Written question
Reference
346 c563-4W; 113904
Session
1999-00
Subjects
Costs Defence equipment Bomb disposal Landmines Procurement