Proceeding contribution from Denis Murphy (Labour) in the House of Commons on Wednesday, 10 January 2007. It occurred during Adjournment debate on Ashington, Blyth and Tyne Railway.
Ashington, Blyth and Tyne Railway
I agree with my hon. Friend that that is of course vital. Indeed, the timing of this debate, for both schemes, is probably the best that we could have picked. I will touch on some of the issues that he raised later in my contribution, but I certainly agree with his intervention. As I was explaining, the train lays over at Hepscott before commencing its journey. It should be possible to extend the service to Bedlington station and to use the existing disused platform, taking advantage of the excellent bus and rail interchange at Bedlington. A new station platform would be required where the A1068 crosses the line at the Swan public house, which was the site of former Choppington station. There is space at the site to develop park-and-ride and bus interchange facilities. Preliminary discussions with Northern Rail suggest that an extension as far as Bedlington station would be feasible within the current timetable. I also point out to my hon. Friend the Minister that that would cost a fraction of Railtrack’s original costings, and provide a much needed rail link from Wansbeck to Tyneside. Although not covered by the current study, SENRUG has planned further phases that could be introduced with an adjustment to Northern’s regional timetable, without the need for extra rolling stock at this stage. Phase 2 would be to extend trains from Bedlington into Ashington. It has been calculated that the journey time from Ashington to Newcastle on that route would be only 36 minutes. Phase 2a would be to extend beyond Ashington on the existing track to a new station at Woodhorn museum. As I mentioned, the museum has been given a £16 million facelift, and charts the growth of coal mining in south-east Northumberland, along with the unique culture and heritage that developed from mining. The museum houses, in an extensive new gallery, the internationally renowned collection of paintings by the Ashington miners group, with images depicting everyday life, work underground and scenes in and around the Ashington area. The museum now also houses the Northumberland records office, with access to all the facilities online. The museum is adjacent to hundreds of acres of woodland, with walks, wildlife and a lake with a narrow gauge railway running through it. Entry to the museum is free of charge. The journey from Woodhorn to Newcastle would take approximately 40 minutes. If a long platform were built at Woodhorn, the station would be likely to attract incoming weekend charter trains from the rest of the country, bringing people into Northumberland.
Secondary information
- Type
- Proceeding contribution
- Reference
- 455 c137-8WH
- Session
- 2006-07
- Chamber / Committee
- Westminster Hall
- Subjects
- Coal Mining Railways Passengers Standards Wansbeck Northumberland line
- Link
- View this Proceeding contribution on www.publications.parliament.uk
Librarians' tools
- Timestamp
- 2023-12-15 13:03:46 +0000
- URI
- http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_369130
- In Indexing
- http://indexing.parliament.uk/Content/Edit/1?uri=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_369130
- In Solr
- https://search.parliament.uk/claw/solr/?id=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_369130