Skip to main content

Proceeding contribution from Michael Connarty (Labour) in the House of Commons on Thursday, 19 April 2007. It occurred during Adjournment debate on Nuclear Industry.


Nuclear Industry

Two things confuse me about this. First, on whether AP1000 has been built, I understand that a series already ordered by China is in the process of being built, as is the reactor from Areva. By the time the UK comes to order such technology, it will have been tried and tested elsewhere. The worry would be if the UK tried to engineer the technology to a higher specification and got it wrong. Secondly, on the Canadian CANDU reactor, I understand that the proposal is to initiate the new build of another technology beyond that used at present. I believe that there is an order from somewhere within Canada. It looks as though all three will be competing here with technology that will be new but which will have been built elsewhere and tried and tested.


Secondary information

Type
Proceeding contribution
Reference
459 c154WH 
Session
2006-07
Chamber / Committee
Westminster Hall
Subjects
Decommissioning British Nuclear Fuels Construction Carbon dioxide Energy supply Radioactive waste Nuclear power Nuclear Decommissioning Authority Nuclear fuel reprocessing Nuclear power stations Pollution control Proliferation Safety
Link
View this Proceeding contribution on www.publications.parliament.uk