Proceeding contribution from Angela C Smith (Labour) in the House of Commons on Tuesday, 11 March 2008. It occurred during Adjournment debate on Woodhead Rail Route.
Woodhead Rail Route
If that were a realistic option, it would be the most acceptable one for all sides. We are talking about 440,000 V cables, so it would be a major technological challenge. It would be wise for hon. Members to test the case further with National Grid. However, so far, National Grid has been absolutely firm that it cannot put the cables through the tunnel and run rail capacity through them at the same time. On environmental benefits, our children and grandchildren will never forgive us for losing important opportunities to invest in a lower-carbon future. The Woodhead rail route is one means by which to secure such a future. Any projection of the case for a new trans-Pennine link must take into account the need for extra capacity economically and to proactively engage in the process of incentivising greater use of rail networks by passengers and freight alike. We are talking not only about the possible extra demand but about the modal shift from road to rail, which is important to that lower-carbon future. We can do it by developing the high-speed integrated network that we are discussing. I must make a plea to the Minister to display foresight on the issue and apply the precautionary principle. National Grid's use of the 1953 tunnel must not in any way be allowed for the economic and environmental reasons that I have outlined because it would close down the option of reopening the line in future. However, the omens are not good. Despite the Secretary of State for Transport's intervention in the matter, a rail magazine at the weekend reported:"““Network Rail has dismissed the idea it will pay for the decaying original Woodhead tunnels to be mothballed pending their re-use as electricity cable-carriers.””" In the same article, National Grid says:"““If Network Rail or the Department for Transport wish to maintain the Victorian tunnels, we are willing to discuss this option with them””." We cannot risk stalemate—we cannot risk losing the potential use of the Woodhead route for rail and compromising the national interest because National Grid and Network Rail cannot agree who should maintain the tunnels. Will the Minister commit the Government to sorting out the impasse for the sake of the long-term vision that I have outlined? Will she also commit to looking seriously at the case for a Crossrail for the north? A project that would draw on a wide range of support, including from all three northern regional development agencies, must be worth investigating. The Minister is a good listener and likes to respond—I know that from the work that she has done on flooding in Sheffield. Will she today give us the hope that we can realise our ambition to compete effectively with the London and south-east economy, and that our transport infrastructure will be appropriately modernised in the medium to long term? Will she give us a Crossrail for the north?
Secondary information
- Type
- Proceeding contribution
- Reference
- 473 c65-6WH
- Session
- 2007-08
- Chamber / Committee
- Westminster Hall
- Subjects
- Construction Freight Passengers Tunnels Civil engineering Northern Way Woodhead line
- Link
- View this Proceeding contribution on www.publications.parliament.uk
Librarians' tools
- Timestamp
- 2023-12-16 02:51:51 +0000
- URI
- http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_454272
- In Indexing
- http://indexing.parliament.uk/Content/Edit/1?uri=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_454272
- In Solr
- https://search.parliament.uk/claw/solr/?id=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_454272