Skip to main content

Proceeding contribution from Jonathan Edwards (Plaid Cymru) in the House of Commons on Wednesday, 6 March 2013. It occurred during Adjournment debate on Brechfa West Wind Farm.


Brechfa West Wind Farm

To be fair, the Liberal Democrats joined us in the Lobby, and I am delighted to see the hon. Member for Ceredigion (Mr Williams), who led that rebellion, present in Westminster Hall today.

Many of my constituents are extremely confused why some developments within the two technical advice note 8, or TAN 8, areas that I have in my constituency are a matter for the local planning authority, and why the development at Brechfa West is determined by the Minister. This development by RWE npower renewables is aimed at generating up to 84 MW, and therefore supersedes the ridiculous 50 MW limit that currently determines where responsibility lies.

The Minister will be aware that the UK Government-sponsored Silk commission is currently taking evidence on part two of its report. My party has called for the devolution of power to determine all energy-generating developments. The Labour Government in Wales have limited themselves to calling for full devolution of renewable energy projects. I read in the Western Mail that even the Tory Assembly group wants to increase the limit to 100 MW, although the hon. Member for Montgomeryshire (Glyn Davies) has declared on Twitter that that will happen only “over his dead body”. I have not seen a submission by the Lib Dems on the Silk report but I am confident they will be on the side of progress on this issue.


Secondary information

Type
Proceeding contribution
Reference
559 c266WH 
Session
2012-13
Chamber / Committee
Westminster Hall
Subjects
Devolved matters Infrastructure Planning permission Noise Radar Wind power Carmarthenshire Brechfa Forest
Link
View this Proceeding contribution on www.publications.parliament.uk