1-9 of 9 results for subject:Trident
Librarians' tools
- Search time
- 0.22 seconds
- Solr query time
- 0.004 seconds
- Search query
- subject:Trident
- We searched for
- subject_t:Trident OR subject_ses:13379
Type
House
Session
Year
Department
Member
Primary member
Answering member
More
Legislative stage
Legislation
Subject
Publisher
Pursuant to his oral Answer of 11th February, Official Report, columns 125-6W if he will set out the basis of his estimate for the total cost of the nuclear programme; and if he will list for each year the sum in 1997 prices represented by that estimate.
Pursuant to his oral Answer of 11th February, Official Report, columns 125-6W if he will set out the basis of his estimate for the total cost of the nuclear programme; and if he will list for each year the sum in 1997 prices represented by that estimate.
What recent representations he has received about the viability of the nuclear deterrent. (Failed OPQ)
What recent representations he has received about the viability of the nuclear deterrent. (Failed OPQ)
If the United Kingdom will retain its independent nuclear deterrent. - We shall maintain a minimum independent nuclear deterrent for as long as is necessary for this country's security. (Failed OPQ)
If the United Kingdom will retain its independent nuclear deterrent. - We shall maintain a minimum independent nuclear deterrent for as long as is necessary for this country's security. (Failed OPQ)
What arrangements exist for the safety of (a) military and (b) civilian populations in the event of a nuclear leak from Trident. - Inc ref to "Statement on the Defence Estimates 1995".
What arrangements exist for the safety of (a) military and (b) civilian populations in the event of a nuclear leak from Trident. - Inc ref to "Statement on the Defence Estimates 1995".
What emergency berths exist in Scotland for Trident in the event of a nuclear reactor or weapon incident; and where they are situated.
What emergency berths exist in Scotland for Trident in the event of a nuclear reactor or weapon incident; and where they are situated.
When Trident is expected to take up a sub-strategic nuclear role. - Ref to 257 c1097W.
When Trident is expected to take up a sub-strategic nuclear role. - Ref to 257 c1097W.
What is the current annual cost of maintaining the Trident system. - Average annual operating cost of Trident over its life will be about £200 million.
What is the current annual cost of maintaining the Trident system. - Average annual operating cost of Trident over its life will be about £200 million.
What is the current yearly cost of maintaining the United Kingdom's nuclear capability. - Figures given.
What is the current yearly cost of maintaining the United Kingdom's nuclear capability. - Figures given.