Publisher
To ask the Secretary of State for Transport, pursuant to the answer of 19 March 2026 to question 121208 on A14: Trees, what steps National Highways is taking to ensure the survival of replanted saplings on the A14 during heatwave temperatures and drought.
To ask the Secretary of State for Transport, pursuant to the answer of 19 March 2026 to question 121208 on A14: Trees, what steps National Highways is taking to ensure the survival of replanted saplings on the A14 during heatwave temperatures and drought.
National Highways has put in place measures to improve the survival rates of replanted saplings. This is part of its new approach to tree planting, designed to better account for increasing environmental pressures, including changing weather patterns and drought.
During the current period of hot and dry weather, the saplings alongside the A14 are being watered weekly, using water from the borrow pits created during the construction of the A14 scheme. Other measures include the use of soil improver and an organic moisture-retention product. After the summer, National Highways will undertake a survey of the replanted saplings to assess survival rates.
To ask the Secretary of State for Transport, pursuant to the Answer of 19 March 2026 to Question 121208 on A14: Trees, whether the work to remove redundant biodegradable and plastic tree guards along the A14 Cambridge to Huntingdon scheme has commenced; and what the expected completion date is.
To ask the Secretary of State for Transport, pursuant to the Answer of 19 March 2026 to Question 121208 on A14: Trees, whether the work to remove redundant biodegradable and plastic tree guards along the A14 Cambridge to Huntingdon scheme has commenced; and what the expected completion date is.
National Highways has commenced work to remove redundant biodegradable and plastic tree guards along the A14 Cambridge to Huntingdon scheme. To date, around 36,000 redundant tree guards have been removed, and the work is expected to be completed by May 2026.
To ask the Secretary of State for Transport, what was the cost of tree planting as part of delivery of the new A14.
To ask the Secretary of State for Transport, what was the cost of tree planting as part of delivery of the new A14.
The cost of the original tree planting on the A14 (between late 2019 and early 2020, delivered under a Development Consent Order) cannot be separated from other planting and landscaping activities, and this is the standard contractual approach. The total cost of all planting and landscaping activities was £8,075,752.
To ask the Secretary of State for Transport, what steps has she taken to review the current status of land for environmental mitigation along the A14.
To ask the Secretary of State for Transport, what steps has she taken to review the current status of land for environmental mitigation along the A14.
National Highways has assessed the status of the land and is taking steps to improve its condition, including replanting substantial numbers of trees, protecting ecological sites and creating new wildlife habitats.
Whether she has reviewed with Cabinet colleagues the status of land used for environmental mitigation along the A14 in Huntingdon constituency.
Whether she has reviewed with Cabinet colleagues the status of land used for environmental mitigation along the A14 in Huntingdon constituency.
National Highways has assessed the status of the land and is taking steps to improve its condition, including replanting substantial numbers of trees, protecting ecological sites and creating new wildlife habitats.
National Highways has assessed the status of the land and is taking steps to improve its condition, including replanting substantial numbers of trees, protecting ecological sites and creating new wildlife habitats.
National Highways has assessed the status of the land and is taking steps to improve its condition, including replanting substantial numbers of trees, protecting ecological sites and creating new wildlife habitats.
Whether she has reviewed with Cabinet colleagues the status of land used for environmental mitigation along the A14 in Huntingdon constituency.
I thank the Minister for his response the other day to my written question, which made clear that the trees would be replanted alongside the A14. I have surveyed that area in recent weeks, and it is real mess. The land has simply not been maintained after the environmental land-management schemes were put in place, so it is reassuring to hear that the trees will be replaced. However, there are other problems with some of the schemes: some of the buildings that were compulsorily purchased have not been maintained and have become dilapidated, National Highways is ransoming access to the land to local developers by charging a 30% shared value increase, just so that developers can gain access to the A14, and we have dangerous at-grade junctions. Will the Minister meet me to discuss some of the problems that we have with access to the A14 in Huntingdonshire, so that my constituents can be reassured that we are working hard to ensure that that road works as it should?
I thank the Minister for his response the other day to my written question, which made clear that the trees would be replanted alongside the A14. I have surveyed that area in recent weeks, and it is real mess. The land has simply not been maintained after the environmental land-management schemes were put in place, so it is reassuring to hear that the trees will be replaced. However, there are other problems with some of the schemes: some of the buildings that were compulsorily purchased have not been maintained and have become dilapidated, National Highways is ransoming access to the land to local developers by charging a 30% shared value increase, just so that developers can gain access to the A14, and we have dangerous at-grade junctions. Will the Minister meet me to discuss some of the problems that we have with access to the A14 in Huntingdonshire, so that my constituents can be reassured that we are working hard to ensure that that road works as it should?
On the specific topic of trees, it is an absolute scandal that something like 600,000 trees died as part of the previous Government’s road schemes—some 90% of the trees died at that particular scheme—but of course I will be happy to meet the hon. Gentleman to discuss the individual issues that he raised.
On the specific topic of trees, it is an absolute scandal that something like 600,000 trees died as part of the previous Government’s road schemes—some 90% of the trees died at that particular scheme—but of course I will be happy to meet the hon. Gentleman to discuss the individual issues that he raised.
On the specific topic of trees, it is an absolute scandal that something like 600,000 trees died as part of the previous Government’s road schemes—some 90% of the trees died at that particular scheme—but of course I will be happy to meet the hon. Gentleman to discuss the individual issues that he raised.
I thank the Minister for his response the other day to my written question, which made clear that the trees would be replanted alongside the A14. I have surveyed that area in recent weeks, and it is real mess. The land has simply not been maintained after the environmental land-management schemes were put in place, so it is reassuring to hear that the trees will be replaced. However, there are other problems with some of the schemes: some of the buildings that were compulsorily purchased have not been maintained and have become dilapidated, National Highways is ransoming access to the land to local developers by charging a 30% shared value increase, just so that developers can gain access to the A14, and we have dangerous at-grade junctions. Will the Minister meet me to discuss some of the problems that we have with access to the A14 in Huntingdonshire, so that my constituents can be reassured that we are working hard to ensure that that road works as it should?
To ask the Secretary of State for Transport, what steps has she taken to remove the tree guards from dead saplings along the A14.
To ask the Secretary of State for Transport, what steps has she taken to remove the tree guards from dead saplings along the A14.
As part of its planned maintenance activities including replanting new trees, adding nutrients to the soil and grass cutting, National Highways will begin removing both redundant biodegradable and plastic tree guards adjacent to A14 Cambridge to Huntingdon scheme. National Highways has scheduled this work to start this month (March 2026).
To ask the Secretary of State for Transport, if she will make it her policy to review the effectiveness of National Highways' deployment of traffic officers on the A14 during serious accidents.
To ask the Secretary of State for Transport, if she will make it her policy to review the effectiveness of National Highways' deployment of traffic officers on the A14 during serious accidents.
The police manage all incidents on the A14. National Highways is informed by the police of all incidents on the A14 and provides traffic officer support for serious incidents when a unit is available to attend.
To ask the Secretary of State for Transport, whether she plans to take steps to help tackle congestion at Copdock Junction of the A14 and A12 in Suffolk.
To ask the Secretary of State for Transport, whether she plans to take steps to help tackle congestion at Copdock Junction of the A14 and A12 in Suffolk.
Proposed improvements to Junction 55 of the A14, Copdock Junction remain under consideration for delivery in a future Road Investment Strategy.
Yes, yes and yes.
Yes, yes and yes.
Junction 10A on the A14 is a crucial piece of future roads infrastructure to support Kettering’s housing expansion. Should North Northamptonshire Council
approve the relevant planning application this coming Monday, will my hon. Friend the roads Minister reconfirm his commitment to give the proper direction this project needs to proceed at pace, to visit the site with me and to arrange for me to meet with National Highways to ensure progress?
Junction 10A on the A14 is a crucial piece of future roads infrastructure to support Kettering’s housing expansion. Should North Northamptonshire Council
approve the relevant planning application this coming Monday, will my hon. Friend the roads Minister reconfirm his commitment to give the proper direction this project needs to proceed at pace, to visit the site with me and to arrange for me to meet with National Highways to ensure progress?
Junction 10A on the A14 is a crucial piece of future roads infrastructure to support Kettering’s housing expansion. Should North Northamptonshire Council
approve the relevant planning application this coming Monday, will my hon. Friend the roads Minister reconfirm his commitment to give the proper direction this project needs to proceed at pace, to visit the site with me and to arrange for me to meet with National Highways to ensure progress?
Yes, yes and yes.
Motion that this House has considered junction 10A on the A14 at Kettering. Agreed to on question.
Motion that this House has considered junction 10A on the A14 at Kettering. Agreed to on question.
I beg to move,
That this House has considered junction 10A on the A14 at Kettering.
May I say what a pleasure it is to see you, as such a distinguished and experienced member of the Panel of Chairs, in the Chair for our proceedings today, Sir Gary? I thank Mr Speaker...
I beg to move,
That this House has considered junction 10A on the A14 at Kettering.
May I say what a pleasure it is to see you, as such a distinguished and experienced member of the Panel of Chairs, in the Chair for our proceedings today, Sir Gary? I thank Mr Speaker...
What a pleasure and joy it is to serve under your chairmanship, Sir Gary. I put on record my thanks for your work in the House of Commons and our sadness that you are departing; those massive shoes will need to be filled.
It is an honour to respond to my...
What a pleasure and joy it is to serve under your chairmanship, Sir Gary. I put on record my thanks for your work in the House of Commons and our sadness that you are departing; those massive shoes will need to be filled.
It is an honour to respond to my...
Before the Minister sits down, I thank him for his detailed and assiduous response. Once the planning permission is granted—hopefully in the next couple of months—would the Minister be kind enough to come and visit the site so that he can see it for himself and we can then progress...
Before the Minister sits down, I thank him for his detailed and assiduous response. Once the planning permission is granted—hopefully in the next couple of months—would the Minister be kind enough to come and visit the site so that he can see it for himself and we can then progress...
My hon. Friend has prejudged the point I was going to make, which is that it would unquestionably be a delight, an honour and a privilege to return to the good people of Kettering and to spend some time with him. That was my intention. I do not think there...
My hon. Friend has prejudged the point I was going to make, which is that it would unquestionably be a delight, an honour and a privilege to return to the good people of Kettering and to spend some time with him. That was my intention. I do not think there...
The roads Minister will know that the proposed £40-million junction 10A on the A14 at Kettering is crucial for the future prosperity of the town. Can he assure me that National Highways is working expeditiously with the Hanwood Park developer and North Northamptonshire Council to ensure that the project is delivered as soon as possible after 2025?
The roads Minister will know that the proposed £40-million junction 10A on the A14 at Kettering is crucial for the future prosperity of the town. Can he assure me that National Highways is working expeditiously with the Hanwood Park developer and North Northamptonshire Council to ensure that the project is delivered as soon as possible after 2025?
I can provide my hon. Friend with that assurance. Having visited his constituency and met him near the project, I know how important it is to him. National Highways is working to do everything possible to see the project come to delivery.
I can provide my hon. Friend with that assurance. Having visited his constituency and met him near the project, I know how important it is to him. National Highways is working to do everything possible to see the project come to delivery.
I can provide my hon. Friend with that assurance. Having visited his constituency and met him near the project, I know how important it is to him. National Highways is working to do everything possible to see the project come to delivery.
The roads Minister will know that the proposed £40-million junction 10A on the A14 at Kettering is crucial for the future prosperity of the town. Can he assure me that National Highways is working expeditiously with the Hanwood Park developer and North Northamptonshire Council to ensure that the project is delivered as soon as possible after 2025?