1-20 of 35 results for subject:A4
Librarians' tools
- Search time
- 0.295 seconds
- Solr query time
- 0.002 seconds
- Search query
- subject:A4
- We searched for
- subject_t:A4 OR subject_ses:514572
Type
House
Session
Year
Department
Member
More
Primary member
Answering member
Legislative stage
Legislation
Subject
More
Publisher
Pedestrian safety at the junction of A4 Jersey Road
The petition of residents of Heston,
Declares that, following a tragic accident in which a Hounslow father, Terence Gillard, lost his life, the safety of the junction at the intersection of Jersey and Great West Road must be improved, notes that this junction...
Pedestrian safety at the junction of A4 Jersey Road
The petition of residents of Heston,
Declares that, following a tragic accident in which a Hounslow father, Terence Gillard, lost his life, the safety of the junction at the intersection of Jersey and Great West Road must be improved, notes that this junction...
Pedestrian safety at the junction of the A4 and Jersey Road
I rise on behalf of residents of Heston to present this petition calling for urgent safety improvements to the Great West Road-Jersey Road junction following the tragic death of 84-year-old Heston resident Terence Gillard. Terence Gillard was a much-loved husband...
Pedestrian safety at the junction of the A4 and Jersey Road
I rise on behalf of residents of Heston to present this petition calling for urgent safety improvements to the Great West Road-Jersey Road junction following the tragic death of 84-year-old Heston resident Terence Gillard. Terence Gillard was a much-loved husband...
To ask Her Majesty’s Government when they expect work on the Hammersmith flyover, scheduled to finish in summer 2014, to be completed.
To ask Her Majesty’s Government when they expect work on the Hammersmith flyover, scheduled to finish in summer 2014, to be completed.
Transport in London, including the Hammersmith Flyover, is the responsibility of the Mayor and Transport for London.
Work to strengthen the Hammersmith flyover, including replacing the bearings, installing a new carriageway drainage system and resurfacing and waterproofing the entire flyover, is due to be completed in summer 2015.
To ask the Secretary of State for Transport, when the temporary lower speed limit on the A4 Hammersmith flyover will be lifted.
To ask the Secretary of State for Transport, when the temporary lower speed limit on the A4 Hammersmith flyover will be lifted.
The Mayor of London is responsible for this matter. I understand from Transport for London that the reduction in the speed limit to 30 mph was a permanent measure, and that there are no plans to revert back to the 40 mph speed limit on the Hammersmith Flyover. This is because during the strengthening work prior to the Olympic Games in 2012, the speed limit on the carriageway was permanently reduced from 40 mph to 30 mph to maintain road safety. This was due to the reduction in road width required to enable the installation of the post-tensioning system in the central reserve. There are still some strengthening and bridge bearing replacement works to be carried out and these are currently being delivered.
To ask the Secretary of State for Transport where she plans the A4 to run in relation to Heathrow airport in proposals in the Adding Capacity at Heathrow consultation; and what assessment she has made of the security implications of the location of the road.
To ask the Secretary of State for Transport where she plans the A4 to run in relation to Heathrow airport in proposals in the Adding Capacity at Heathrow consultation; and what assessment she has made of the security implications of the location of the road.
To ask the Secretary of State for Transport, how many accidents have occurred on the A4 between Maidenhead and Reading in each year since 1995; how many resulted in (a) personal injuries and (b) death; how many involved drunk driving; how many resulted in prosecution and how many of the...
To ask the Secretary of State for Transport, how many accidents have occurred on the A4 between Maidenhead and Reading in each year since 1995; how many resulted in (a) personal injuries and (b) death; how many involved drunk driving; how many resulted in prosecution and how many of the...
To ask the Secretary of State for the Environment, Transport and the Regions, what reduction in hourly capacity has been caused by traffic management changes to the A4 Cromwell Road in the last three years. - Inc fact that no figures given.
To ask the Secretary of State for the Environment, Transport and the Regions, what reduction in hourly capacity has been caused by traffic management changes to the A4 Cromwell Road in the last three years. - Inc fact that no figures given.
What is the nature of the roadworks on the eastbound section of the A.4 between Hogarth Roundabout and the Hammersmith flyover; whether it is necessary to close one carriageway to traffic; and whether night and weekend working are planned to speed up completion. [HL 2016} - Inc text of letter...
What is the nature of the roadworks on the eastbound section of the A.4 between Hogarth Roundabout and the Hammersmith flyover; whether it is necessary to close one carriageway to traffic; and whether night and weekend working are planned to speed up completion. [HL 2016} - Inc text of letter...
What plans exist to improve the approach road to London from Heathrow along the M4 and beyond; and if he will instigate a competition to (a) design landscaping on embankments, (b) improve central reservations and (c) site sculptural works so as to give a better impression to visitors and the...
What plans exist to improve the approach road to London from Heathrow along the M4 and beyond; and if he will instigate a competition to (a) design landscaping on embankments, (b) improve central reservations and (c) site sculptural works so as to give a better impression to visitors and the...
What proposals he has to improve the A4 access to London. (Failed OPQ)
What proposals he has to improve the A4 access to London. (Failed OPQ)
What is the purpose of the roadworks on the A4 West Cromwell road; what will they cost; why they were begun during the Christmas period; and whether the procedures prescribed by the New Roads and Streetworks Act 1991 were followed.
What is the purpose of the roadworks on the A4 West Cromwell road; what will they cost; why they were begun during the Christmas period; and whether the procedures prescribed by the New Roads and Streetworks Act 1991 were followed.
What is the purpose of the work on the central reservation of the Great West Road between the Hammersmith flyover and the Hogarth roundabout; what it will cost; and whether the procedures prescribed by the New Roads and Streetworks Act 1991 were followed.
What is the purpose of the work on the central reservation of the Great West Road between the Hammersmith flyover and the Hogarth roundabout; what it will cost; and whether the procedures prescribed by the New Roads and Streetworks Act 1991 were followed.
Whether any consultation took place with the local authority, the local community, the Metropolitan Police or any motoring organisations prior to the erection of the type of fencing recently erected at Cranford. (Holding answer 11 Nov 91).
Whether any consultation took place with the local authority, the local community, the Metropolitan Police or any motoring organisations prior to the erection of the type of fencing recently erected at Cranford. (Holding answer 11 Nov 91).
What was the cost of supplying and erecting the wire fence recently erected along the central reservation of the A4 at Cranford. - About #125,000. (Holding answer 11 Nov 91).
What was the cost of supplying and erecting the wire fence recently erected along the central reservation of the A4 at Cranford. - About #125,000. (Holding answer 11 Nov 91).
What studies or plans are in hand for alterations at the junctions on the A4 road between Brentford and Hammersmith.
What studies or plans are in hand for alterations at the junctions on the A4 road between Brentford and Hammersmith.
What would be the cost of providing (a) a further light-controlled crossing on and (b) a pedestrian bridge over the Cranford section of the A4. - Inc figure.
What would be the cost of providing (a) a further light-controlled crossing on and (b) a pedestrian bridge over the Cranford section of the A4. - Inc figure.