Written question asked by Earl Attlee (Conservative), in the House of Lords. It was answered by Lord Bassam of Brighton (Labour) on Wednesday, 11 July 2007.


Roads

Question
asked Her Majesty's Government:What is the function within the United Kingdom road network of the A329(M) south of the M4 motorway; and why it was built; and
Answer

The A329(M) and the A322 are both roads which are not part of the motorway and all-purpose trunk road network, and as such are maintained by the relevant local highway authorities. They are designated as primary routes under Section 1 of the Traffic Signs Regulations and General Directions 2002, and in the opinion of the Secretary of State for Transport provide, outside of the motorway and trunk road network, the most satisfactory route for through traffic between places of traffic importance. The Department for Transport does not hold records of the suitability of the A322 or A329(M) to accommodate abnormal loads, as these roads are the responsibility of the local highway authorities through which they pass. For abnormal loads falling within the terms of the Road Vehicles (Authorisation of Special Types) Order 2003, it is for the haulier to notify the relevant local highway authorities, owners of structures and police of the route over which an abnormal load would pass, and to propose an alternative route if its initial route is refused. Structure owners and highway authorities are notified to ensure that abnormal loads will not pose a danger to structures and highways during a move. The assessment of the congestion on the M25 motorway between the M3 and M4 motorways, in line with the PSA journey time reliability target, is that the worst 10 per cent of journeys travelling clockwise experience a delay of five minutes and 44 seconds, and anti-clockwise a delay of eight minutes and 22 seconds, for each 10 miles. Congestion may be caused by incidents, planned roadworks and limited capacity. To reduce incident-related congestion, Highways Agency traffic officers now patrol the M25, helping to clear incidents more quickly. Roadworks are planned to keep as many lanes as possible open and work is carried out at night whenever possible. This section has recently been widened to five lanes to address capacity issues and has variable compulsory speed limits which smooth traffic flow. The Highways Agency manages information for customers through a telephone information line and the internet to enable journeys to be planned to avoid congestion where possible. In addition, the Highways Agency is conducting a trial new road layout at the junction between the M25 and the M3 (junction 12, M25) to give an extra lane to traffic joining the M3 coastbound from the M25. This reduces traffic queuing to leave the M25 at this junction, especially in the anti-clockwise direction. The Highways Agency is also considering schemes at either end of the stretch of the M25 between junctions 12 and 15 in order to alleviate congestion.


Secondary information

Type
Written question
Reference
4687; 693 c230-1WA
Session
2006-07
Subjects
Construction Large goods vehicles M25 Road traffic Roads Road traffic control M3 M4 A329(M) A322
Contains statistics
Yes
Link
View this Written question on www.publications.parliament.uk