Proceeding contribution from Peter Soulsby (Labour) in the House of Commons on Tuesday, 23 October 2007. It occurred during Legislative debate on Crossrail Bill (Carry-over).
Crossrail Bill (Carry-over)
Thank you, Mr. Deputy Speaker. I entirely accept your guidance on that matter. There will no doubt be other occasions on which I shall be able to refer to that strange and unsatisfactory part of the process. We as a Committee were charged with a quasi-judicial role in relation to the Bill. We provided an audience for petitioners, and we were successful in concentrating the efforts of the promoters and the petitioners to reach agreement, often outside the Committee Room, and in taking a view of the particular circumstances of those who petitioned against the Bill. That enabled us to make sensible proposals with regard, for example, to the traders in Smithfield, whose situation is undoubtedly different from that of many other traders who might be affected by a similar Bill. As my right hon. Friend the Member for Greenwich and Woolwich (Mr. Raynsford) reminded us, we had the opportunity to argue forcefully and successfully, supported by him and other right hon. and hon. Members, for the station at Woolwich, and we proposed amendments to the Bill to enable a station to be built. We picked up a wide range of other issues, some as major and significant as the way in which Liverpool Street station should be modified, and some apparently trivial but important to the people affected by them, such as how people's back gardens would be affected and whether a couple of metres of land should be taken. That may be significant to them, but not of the same significance to the scheme as matters such as Liverpool Street. We have been able to respond appropriately to the cases put to us. To some extent we were hindered by the fact that the Committee can only be reactive in its response. It sits, essentially, to hear petitions and respond to petitioners against the Bill. It cannot be proactive. Although we took opportunities to make visits and to examine more generally some of the matters before us, issues about how hybrid Bill Committees operate could usefully be re-examined in the light of our experience, before a similar scheme comes before the House, possibly after a gap of some 10 years, as with the present Bill. As is evident from our report, we hope that the Committee in the Lords will consider the fundamental issue of the public, Members of the House and, ultimately, Members in another place fully understanding what the Bill requires, as opposed to what it permits. We as a Committee felt that a list of amendments and undertakings was not sufficient. There should be an opportunity for Members and the public to gain a better understanding of what is permitted and what is required by the Bill. I gave one example when I referred to Liverpool Street station. Although the Committee was anxious that that should be dealt with in a particular way, as a result of the process that we had gone through we could not be certain what would be delivered when the promoters built in the area. Similarly, the major triumph for the campaign for a station at Woolwich merely permits a station to be built there. In conjunction with that permission having been granted, the Government have gone to great lengths to ensure that an appropriate consortium is brought together and a funding package is made available to enable a station to be built, but it is not, as I understand it, a requirement of the Bill that such a station should be provided. That is an example of one of the issues that the Committee thought should be borne in mind both as the Bill continues its passage and more generally when we consider how hybrid Bills are dealt with in future. It would have been useful if the Committee had had an opportunity, like Public Bill Committees, to hear evidence on some of the issues. We could have done so in respect of ground-borne noise, the compensation code, freight—we have specifically suggested that the other place might wish to consider freight—or whether a floating-slab track was appropriate. Such issues could usefully have been the subject of evidence sittings at the outset. Those sittings would have enormously helped the Committee to consider the significant number of petitions, although we did do that, and to do its job consistently throughout the process. They would have enabled Members who could not attend all sittings to understand the wider picture. The Committee has come to the end of the process and we are enormously grateful for the support of the staff of the House: the Clerks—particularly the excellent Committee Assistants—and the various parts of the House administration, which have helped our work. We were enormously helped by the promoter's counsel, who enabled us to understand some of the issues that in an ideal world we would have wished to explore independently. They helped us to make the system work flexibly. As I hinted earlier, there are issues for the House on how Committees dealing with hybrid Bills should be appointed in future. There are questions about the powers given to them and—as is evident in our report—about the instructions given to them. I hope that despite those issues, the House will feel that we have done our work conscientiously, well and thoroughly. I hope that we have helped reassure the House that the Bill can be carried over with confidence. It is appropriate that the carry-over motion should have come from the Committee, with our report, to the House, and that backing and funding should be being given just as the last hybrid Bill to have been successfully steered through the House—that for the channel tunnel rail link—is having such a dramatic impact at St. Pancras, where the link will soon open. I speak with confidence on behalf of the majority of the Committee's members in saying that I hope that what we have produced in the past two years to take forward the Crossrail Bill will ultimately result in something that will equal the importance of the channel tunnel rail link—not only to London, but to the infrastructure of the United Kingdom in general.
Secondary information
- Type
- Proceeding contribution
- Reference
- 465 c196-8
- Session
- 2006-07
- Chamber / Committee
- House of Commons chamber
- Subjects
- Construction Elizabeth line Crossrail Finance Greater London Environmental impact assessment Railway stations Railways Railway network Public participation Reading (Berkshire) Underground railways
- Legislation
- Crossrail Bill 2004/05 to 2005-06 to 2006-07 to 2007-08
- Link
- View this Proceeding contribution on www.publications.parliament.uk
Librarians' tools
- Timestamp
- 2023-12-15 12:15:02 +0000
- URI
- http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_419004
- In Indexing
- http://indexing.parliament.uk/Content/Edit/1?uri=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_419004
- In Solr
- https://search.parliament.uk/claw/solr/?id=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_419004