Proceeding contribution from Chris Mole (Labour) in the House of Commons on Wednesday, 6 January 2010. It occurred during Adjournment debate on Maidstone East Line.


Maidstone East Line

The Department looks at its budget for the support of rail services as a whole, not on the basis of individual franchises. I can therefore tell him only what the position is as a whole. Customers travelling from Maidstone and Malling to the City have two options. They can take the train to London Victoria and use the underground to reach a suitable station in the City, or they can change at Bromley South for services to London Blackfriars—I accept that that means that the journey will take slightly longer. My letter to the right hon. Gentleman of 27 November stated that the additional journey time would usually be between 15 and 30 minutes on each trip, but clearly individual circumstances will vary. The generalised journey times demonstrated by Transport for London's journey planning tools bear those figures out. If people really do wish to travel to and from London quicker than the services from Maidstone and Malling allow, other reasonable options are available. London Victoria is a busy station and Transport for London has developed plans to improve it. However, it provides a range of interchange opportunities for passengers. Approximately 70,000 people use Victoria underground station during peak hours and it is anticipated that a further 200 to 300 people will need to use it as a result of the December 2009 timetable change. I note the right hon. Gentleman's assertion that higher numbers of passengers have been counted on some trains by users. However, the 200 to 300 people refers to those who board and alight in Maidstone and Malling. The total numbers include people travelling to and from Ashford, who have a different journey option. As I said, people who do not wish to use the underground can take advantage of the cross-platform connection at Bromley South. It has been suggested that withdrawing the services might adversely affect the local economy. We have not seen evidence that there will be any detriment to the local economy as a direct result of the services being withdrawn. I reiterate that independent market research confirmed that withdrawing the services would be the correct decision because there is insufficient demand to make their continuation cost-effective. It has been argued that removing the services will force people to drive to other stations to reduce their commuting time. Nobody is being forced to drive away from where they live to make a rail journey between Maidstone or Malling and London. Southeastern offers a wide variety of services to different destinations. It is inevitable that people will make the individual journey choice that suits them best. Southeastern's network serves seven London terminal stations, in contrast to the situation that the right hon. Gentleman described with my rail service. That makes it the best connected commuter network in the UK. Most commuter operators serve only one or two terminal stations. The December 2009 timetable seeks to make the best use of the rail network in Kent and delivers wider benefits to communities across the network. It delivers new high-speed services that provide significantly faster journey times for towns such as Dover, Folkestone, Ashford, Canterbury, Ramsgate, Gravesend and Chatham. It also provides new capacity and journey opportunities for the wider area. The timetable delivers benefits to west Kent with additional capacity at Sevenoaks, Tonbridge and Tunbridge Wells, which result from the freeing-up of seats and the introduction of the high-speed service. The timetable delivers capacity improvements to the Medway towns for the same reasons. Looking ahead, the rail industry's route utilisation strategy for Kent proposes many improvements. It proposes the improvement of signalling and track between Faversham and Ramsgate. It suggests an improvement in capacity across the network by allowing platforms to take longer trains. For the Maidstone East line, that will mean ensuring that all stations can take trains with up to eight coaches. In addition to existing services to and from London Victoria, it is proposed that Thameslink services run directly to and from the Maidstone East line as part of the longer term Thameslink programme. That will ensure that there is a direct service to and from the Maidstone East line that serves London Blackfriars, City Thameslink, Farringdon and St. Pancras International. I believe that the December 2009 timetable offers people in the Maidstone and Malling area a good choice of destinations in London. It is worth noting that that choice is greater than that offered to customers by most rail companies. A change of this type must be reviewed to ensure that all objectives have been achieved. Therefore, the Department has agreed with Southeastern that there will be a full review of the timetable early in 2010. That will include, but will not be limited to, monitoring loadings, performance and connectivity, and reviewing the success of the overall implementation. If the review highlights areas where the implementation has not been as successful as anticipated, the Department and Southeastern will consider carefully what to do. Sitting suspended.


Secondary information

Type
Proceeding contribution
Reference
503 c98-9WH 
Session
2009-10
Chamber / Committee
Westminster Hall
Subjects
Kent Railways Timetables Southeastern (2006-21) Maidstone line
Link
View this Proceeding contribution on www.publications.parliament.uk