Skip to main content

Proceeding contribution from Lord Teverson (Liberal Democrat) in the House of Lords on Tuesday, 9 March 2010. It occurred during Debate on Energy: Draft National Policy Statement for Nuclear Power Generation (EN-6).


Energy: Draft National Policy Statement for Nuclear Power Generation (EN-6)

I do not normally interrupt the Minister but I genuinely do not understand the basis on which the IPC can say no. There is an absolute presumption, in the way in which the report is written, that these sites are suitable for nuclear power. It is much stronger than the usual planning regime—I think they are called PPSs. On what basis, which would not immediately be appealed against in some way, can they say no?


Secondary information

Type
Proceeding contribution
Reference
718 c84-5GC 
Session
2009-10
Chamber / Committee
House of Lords Grand Committee
Subjects
Decommissioning Cumbria Environment protection Infrastructure Planning permission Planning Radioactive waste Nuclear power Nuclear power stations Training Sustainable development Waste management Research Sellafield Infrastructure Planning Commission National policy statements Oldbury power station Dungeness B power station
Link
View this Proceeding contribution on www.publications.parliament.uk