Skip to main content

Proceeding contribution from Lord Khan of Tooting (Labour) in the House of Commons on Thursday, 11 March 2010. It occurred during Ministerial statement on High Speed Rail.


High Speed Rail

The hon. Gentleman raises a really important point. We have asked HS2 Ltd to look into what further mitigation can be done. It will be no comfort to those of his constituents who will be affected, but about 50 per cent. of the High Speed 2 line will use or be sited next to existing or disused rail lines, or be sited in existing transport corridors. We need to minimise the disruption caused to the hon. Gentleman's constituents, and we are carrying out as much consultation as we possibly can to mitigate the damage caused. That includes having meetings now, before the formal consultation begins, to see how we can address some of the serious, legitimate concerns that are being raised.


Secondary information

Type
Proceeding contribution
Reference
507 c455 
Session
2009-10
Chamber / Committee
House of Commons chamber
Subjects
Costs Construction Elizabeth line Birmingham Greater London Greater Manchester Leeds High speed trains Glasgow Edinburgh Heathrow Airport East Midlands Railway stations Railways Railway network Newcastle upon Tyne Liverpool Sheffield Birmingham Airport West Midlands High Speed Two
Link
View this Proceeding contribution on www.publications.parliament.uk