Skip to main content

Proceeding contribution from Andrew Selous (Conservative) in the House of Commons on Wednesday, 30 June 2010. It occurred during Adjournment debate on A5 to M1 Link.


A5 to M1 Link

I am grateful for my hon. Friend's support. The road will also benefit major towns such as Aylesbury, in providing fast direct access to the national motorway network. I do not want Ministers or officials at the Department for Transport to think for one moment that the Luton-Dunstable busway will provide the answers to the problems of congestion, retail decline and lack of business growth in Dunstable and Houghton Regis. It will not. The only hope to secure economic regeneration to provide much needed jobs for my constituents and to provide much needed local housing is for the A5 to M1 link to be built urgently. The need for the A5 to M1 link can be demonstrated by many examples of life in Dunstable. Dunstable high street has 56 empty shops in it because of the length of time it takes for shoppers to get into and out of the town centre. Some reductions in business rates have been granted as a result, which obviously means a loss of revenue to the Exchequer. During recent times of economic growth, every other area of Bedfordshire increased its level of employment between 2001 and 2008, but in South Bedfordshire there was a loss of 1,850 jobs—overwhelmingly due to congestion. Those figures are taken from the annual business inquiry data provided by the Central Bedfordshire council. Major employers have closed down and left the area over the years and have not been replaced by sufficient numbers of new employers to provide the jobs that my constituents need today. Many of my constituents are forced to travel out of the area to find work, thus making congestion even worse. Congestion is bad both for travellers going north-south on the A5 through Dunstable as well as for travellers heading east-west on the A505 through Dunstable. One story from a local shopkeeper illustrates this well. A customer was travelling east on the A505 along West street, trying to get to a shop in the Quadrant shopping centre in the middle of Dunstable. He was stuck in traffic as so often happens; he rang the shop keeper who left his shop, crossed the middle of Dunstable, gave him the goods as he was stuck in traffic in his car. That customer then turned round in the road, and drove out of Dunstable never to come and shop in the town again. How can the shopkeepers of the town I am proud to represent make a living when they are faced with an infrastructure deficit as bad as that? The economic benefits of building this road have been estimated by both the Highways Agency and the East of England to be very significant. Central Bedfordshire council, with its private sector developers, also intends to build the Woodside industrial estate connection road from the new junction 11A, which will not require Department for Transport funds.


Secondary information

Type
Proceeding contribution
Reference
512 c969-70 
Session
2010-12
Chamber / Committee
House of Commons chamber
Subjects
Motorways Roads Bypasses M1 A5 Dunstable
Link
View this Proceeding contribution on www.publications.parliament.uk