Proceeding contribution from Andrea Leadsom (Conservative) in the House of Commons on Thursday, 31 March 2011. It occurred during Adjournment debate and Backbench debate on High-Speed Rail.
High-Speed Rail
Yes, indeed. There have been plenty of anecdotal reports from low-cost airlines suggesting that they would welcome the opportunity to put on more cheap long-haul flights. I plan to challenge four aspects of the case for HS2: the business case, the environmental case, the claims about job creation and the potential for regeneration. I am a firm believer that one cannot attack something without providing an alternative. I will therefore also discuss a viable alternative to HS2. I have based my challenges on phase 1 of HS2, in spite of the fact, unfortunately, that the consultation incorporates the entire Y-shaped project. There is too little detail on the assumptions underlying phase 2 to be able to assess the figures properly. I also need to point out that the original business case, written by Atkins for the Department for Transport in March 2010, was updated last month. The new business case is considerably less attractive than the old one. I will deal first with the business case for HS2. HS2 Ltd claims a net benefit ratio, which includes the wider economic impacts, of 2. That means that for every pound spent, there will be £2 of benefit. That is about the minimum return that could be expected from a rail project—the bar for roads projects is significantly higher. Even that modest claim, however, makes enormous assumptions. Specifically, one of the core and somewhat ludicrous assumptions is that all the time spent on a train journey is wasted, and therefore that every minute of a train journey that is saved can be given a value in pounds—the number of minutes saved, multiplied by the earnings of an individual. That would not matter so much except that the journey time savings account for more than 50% of the £20 billion of total economic benefit claimed for the project. I urge the Department for Transport to look again closely at that point.
Secondary information
- Type
- Proceeding contribution
- Reference
- 526 c152-3WH
- Session
- 2010-12
- Chamber / Committee
- Westminster Hall
- Subjects
- Construction Finance Environment protection Forecasts Railways Passengers High Speed Two High Speed 2 line High Speed Two Action Alliance
- Link
- View this Proceeding contribution on www.publications.parliament.uk
Librarians' tools
- Timestamp
- 2023-12-15 22:00:26 +0000
- URI
- http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_733238
- In Indexing
- http://indexing.parliament.uk/Content/Edit/1?uri=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_733238
- In Solr
- https://search.parliament.uk/claw/solr/?id=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_733238