Proceeding contribution from Andrea Leadsom (Conservative) in the House of Commons on Thursday, 31 March 2011. It occurred during Adjournment debate and Backbench debate on High-Speed Rail.
High-Speed Rail
I thank my hon. Friend for his comments. I absolutely am a supporter of the northern hub—there is no doubt about that—but I refer him to my comments. HS2 is an extraordinarily expensive way of achieving jobs. In the wider economy, the cost of providing one job through capital expenditure is believed to be some 25% of the cost of providing one job through this project. I do not believe that it is a good way to create jobs, whether in the north or the south. In summary, I believe that HS2 is a deeply flawed proposal that will not deliver the economic, environmental, employment or regeneration benefits that are claimed for it. However, I absolutely recognise the shortcomings of our existing transport infrastructure, and I commend the Government for the many measures they are taking to sort out long-standing bottlenecks. The rebalancing of our economy and a private sector-led recovery will depend on significant investment in infrastructure, but there is an alternative to HS2 that can achieve the capacity the country needs at far better value for money: Rail Package 2. RP2 can provide 135% extra capacity, extendable to 176%, and a significant advantage is that it can be introduced incrementally as passenger demand increases. It requires certain things: lengthening all Pendolino trains to 11 cars from the current mix of nine and 11 cars; replacing some commuter trains with 125 mph stock so as not to delay faster trains; dealing with bottlenecks at seven specific points along the line; adding platforms at Euston and Manchester, and considering laying more track into Birmingham. RP2 to the west midlands has a benefit-cost ratio of 1.9 versus 1.6 for HS2 London to west midlands, excluding the wider economic impacts. The benefit-cost ratio of the whole Y-shaped project is higher, at 2.2, but there is not enough information about the assumptions to evaluate that. In any case, I have provided plenty of information to challenge the assumptions.
Secondary information
- Type
- Proceeding contribution
- Reference
- 526 c155WH
- Session
- 2010-12
- Chamber / Committee
- Westminster Hall
- Subjects
- Construction Finance Environment protection Forecasts Railways Passengers High Speed Two High Speed 2 line High Speed Two Action Alliance
- Link
- View this Proceeding contribution on www.publications.parliament.uk
Librarians' tools
- Timestamp
- 2023-12-15 22:00:27 +0000
- URI
- http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_733247
- In Indexing
- http://indexing.parliament.uk/Content/Edit/1?uri=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_733247
- In Solr
- https://search.parliament.uk/claw/solr/?id=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_733247