Proceeding contribution from Frank Dobson (Labour) in the House of Commons on Thursday, 31 March 2011. It occurred during Adjournment debate and Backbench debate on High-Speed Rail.
High-Speed Rail
I know the Minister is an optimist, but if she thinks I am going to leap to the defence of Lord Adonis, she is a super-optimist. There was no connection—oh dear, the great strategists clean forgot. Now they have bodged a connection. There will be a third bore—if hon. Members will excuse the term—from Old Oak Common, coming out at Primrose Hill. The tunnel will be bored in parallel with the other two tunnels coming into Euston, and will proceed along the North London line to connect to HS1. So far, no one has explained whether it will connect to HS1 through the HS1 line, or by going into the HS1 part of St Pancras station. Perhaps the Minister can elucidate, but I doubt it because I do not think the people at HS2 quite know what they are talking about. Something else that did not appear in the announcement is that the proposal is for that tunnel, and the bit on the North London line, to proceed only at conventional speed. It will be HS2, then a slow bit, then HS1—and we are still supposed to regard the people who came up with that proposition as a set of railway strategists. When HS1 was being built, I recall that the people from Bechtel looked at the possibility of using the North London line as the route into St Pancras. They decided that the cuttings, embankments and bridges along that line were so lousy that it would be cheaper to bore through to St Pancras, which was a considerable distance. When I pointed that out to someone from HS2, they were unaware of that small and apparently irrelevant fact. If we talk of strategy, we must look at the promises made for the high-speed rail network. People have been told that it will be a great network, and that we will continue it further north. Under the strategy, the line will split at Birmingham and part of it will go to Manchester and eventually to Glasgow. In the east it will go first to Leeds and then to Newcastle and Edinburgh. The proposal is for the line to get as far as Birmingham by 2026. I, however, am confident enough to make two forecasts of my own about the London to Birmingham line. First, it will not be in operation by 2026, and secondly it will cost more than the present estimate. I am willing to take bets from any hon. Members present at the end of the debate. If I lose, they will no doubt have to pursue my grandchildren for the debt. I do not pay attention to the prognostications, if there are any, about the likely weight of traffic on the route, or what the scheme is likely to bring in. As my hon. Friend the Member for Coventry North West (Mr Robinson) said, if the Office for Budget Responsibility cannot come up with a suggestion for what is likely to happen at the end of the current year, there are slim chances of anyone—whether for, against or doubtful about the project—coming up with an accurate prognostication about what will happen in 2025-26 or, in the case of Leeds and Manchester, 2035 or 2040. Then there are Glasgow and Edinburgh. My grandchildren, who now reappear in this story, are likely to go on the train from London to Glasgow using their senior railcards; that is the time scale we are talking about.
Secondary information
- Type
- Proceeding contribution
- Reference
- 526 c167WH
- Session
- 2010-12
- Chamber / Committee
- Westminster Hall
- Subjects
- Construction Finance Environment protection Forecasts Railways Passengers High Speed Two High Speed 2 line High Speed Two Action Alliance
- Link
- View this Proceeding contribution on www.publications.parliament.uk
Librarians' tools
- Timestamp
- 2023-12-15 22:01:10 +0000
- URI
- http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_733294
- In Indexing
- http://indexing.parliament.uk/Content/Edit/1?uri=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_733294
- In Solr
- https://search.parliament.uk/claw/solr/?id=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_733294