Skip to main content

Proceeding contribution from Frank Dobson (Labour) in the House of Commons on Thursday, 31 March 2011. It occurred during Adjournment debate and Backbench debate on High-Speed Rail.


High-Speed Rail

I will finish on that point. I was always a strong supporter of the channel tunnel and the channel tunnel link. When the same preposterous railway strategists came up with a proposal to place the terminus for High Speed 1 in a cave under King's Cross station, I was among those who led the opposition to that and proposed St Pancras station instead; we were not entirely nimbyist. Whatever anybody says, that has been a brilliant success. I do not believe that the people who come up with these proposals have done the work properly. If we are to have a proper high-speed network, this is the last way and last place in which to start it.


Secondary information

Type
Proceeding contribution
Reference
526 c168WH 
Session
2010-12
Chamber / Committee
Westminster Hall
Subjects
Construction Finance Environment protection Forecasts Railways Passengers High Speed Two High Speed 2 line High Speed Two Action Alliance
Link
View this Proceeding contribution on www.publications.parliament.uk