Skip to main content

Proceeding contribution from Iain Stewart (Conservative) in the House of Commons on Thursday, 31 March 2011. It occurred during Adjournment debate and Backbench debate on High-Speed Rail.


High-Speed Rail

My hon. Friend makes a very important point. We need to consider that broader strategic case. Yes, we are considering the first phase, from London to Birmingham, and then the second phase, the Y shape, to Leeds and Manchester, but we need to go further than that. We need to consider the case for connecting this to Scotland. Recently, I was at a launch jointly held by the leaders of Glasgow and Edinburgh city councils, who have proposed that as well as building from south to north, we should build from north to south. We need to ensure that we consider the case for connecting the airports and for freeing up capacity on the classic lines to ports so that increased freight can be transferred there. All those lessons can also come from abroad to influence our considerations here. I come now to the environmental points. Again, we need to consider what has happened abroad. The proposed high-speed line will have an operating speed of 250 mph, which is a significant increase on the operating speeds of most high-speed lines in the country. I urge caution on that point. Let us consider Japan, for example. The new generation of the Shinkansen or bullet train can operate at about 250 mph, but it is being limited in its speed because of noise pollution concerns. I would need to dust down my physics textbooks from school to go into the detail, but there are concepts such as tunnel boom noise—if a train operates at such a high speed, it creates additional noise pollution that does not affect conventional TGV lines. We need to consider that. It is significant because some of the possible routes for High Speed 2 have been ruled out by the 250 mph operating speed. That has to do with the curvature of the line. If we conclude that we can operate a high-speed network at a lower speed, at about 180 or 190 mph, we open up the possibility of looking at the high-speed line following the line of route of an existing transport corridor—perhaps the M40, the M1 or the M6. We need to consider all those points. I am conscious of the time; I know that many other hon. Members want to speak. The point is that we need to consider all the arguments carefully. This is one of the biggest and most significant transport infrastructure projects that we have had to face for a generation. Get it right and we will have a world-class transport system in this country. Get it wrong and we will have wasted billions of pounds and disrupted many communities without having proper gain from it.


Secondary information

Type
Proceeding contribution
Reference
526 c170WH 
Session
2010-12
Chamber / Committee
Westminster Hall
Subjects
Construction Finance Environment protection Forecasts Railways Passengers High Speed Two High Speed 2 line High Speed Two Action Alliance
Link
View this Proceeding contribution on www.publications.parliament.uk