Skip to main content

Proceeding contribution from Charles Hendry (Conservative) in the House of Commons on Monday, 18 July 2011. It occurred during Debate on National Policy Statements (Energy).


National Policy Statements (Energy)

Thank you for your strictures, Madam Deputy Speaker. I will be very observant of them in considering which interventions to take. My hon. Friend does make an important point. We are working with communities that have volunteered to take forward some of this work to see whether there are appropriate locations for a waste disposal facility, and we are committed to making this happen. We have expressed an ambition that we should have such a facility open 10 years earlier than previously planned—by 2029 rather than at the end of the 2030s. I hope that that will show to him and others our commitment in this area. On the renewables national policy statement, we do not specify areas in which to locate wind farms, nor have we placed limits on generating capacity in each area, although, as in all cases under the Planning Act 2008, it will be open to the Infrastructure Planning Commission—or, through the Localism Bill, to Ministers—to refuse an application for consent if it considers that the adverse impacts outweigh the benefits. To complement the electricity generation national policy statements, policy statement EN-4 addresses requirements for gas and oil infrastructure and EN-5 addresses those for electricity networks. Changes in the pattern of supply and demand, and shifts in technology mean that we will need more of both those types of infrastructure in the coming decades. Electricity transmission networks most familiarly mean overhead lines supported on pylons, and it is only that type of connection that requires Planning Act consent. Considerable concern has been expressed about the impact on landscapes of an increasing number of networks. The overarching NPS and the electricity networks NPS make it clear that developers should consider undergrounding or subsea cables for transmission networks. The electricity networks NPS also explains that although it would be preferable for grid connections to be applied for at the same time as the generating infrastructure it is associated with, there are circumstances where this may not be economically sensible. We have also stated that the Holford rules should be followed when developers are planning the routes of proposed overhead lines. That actually strengthens the policy, because before this NPS the use of the Holford rules by developers was voluntary.


Secondary information

Type
Proceeding contribution
Reference
531 c685-6 
Session
2010-12
Chamber / Committee
House of Commons chamber
Subjects
Energy Electricity generation Energy supply Infrastructure Nuclear power stations Renewable energy National policy statements
Link
View this Proceeding contribution on www.publications.parliament.uk