Proceeding contribution from Baroness Pinnock (Liberal Democrat) in the House of Lords on Thursday, 27 February 2025. It occurred during Ministerial statement on Grenfell Tower Inquiry: Phase 2 Report.
Grenfell Tower Inquiry: Phase 2 Report
My Lords, 72 people died in the Grenfell Tower fire seven years ago in the most horrifying of circumstances. This phase 2 report on the Grenfell Tower inquiry from Martin Moore-Bick is an excellent analysis and provides a strong challenge to the Government for the decisions they need to make.
It is therefore disappointing that the Secretary of State’s Statement fails to be absolutely clear that the recommendation from the inquiry will be implemented in full. Instead, the words used are that the Government
“accept the findings … and will take forward … the recommendations”.
That is simply unacceptable.
The inquiry exposed a culture of greed and indifference, which must be rooted out of all the organisations associated with this wholly avoidable tragedy—I emphasise that it was wholly avoidable. The Government have a duty to ensure that all buildings with flammable cladding, and where the constructors deliberately omitted fire safety features, are fully remediated, and that the cost is borne entirely by those responsible for those failings.
Leaseholders must not be required to pay anything. Living in a building that is not safe is itself a cause of immense anxiety. Added to that is the scandal of huge rises in insurance costs and service charges, when leaseholders should not be paying anything.
The ministry’s figures show that 9,000 to 12,000 buildings of above 11 metres will need remediation, yet only 4,771 have so far been identified—of which less than half have had work started. The National Audit Office has called for the costs of this work, over and above that funded by the taxpayer, to be placed on developers. That is absolutely right. Can the Minister explain how the costs of this essential work are to be met? For information, the estimate is around £7 billion.
I turn to the 58 recommendations in the report. It recommended a single construction adviser, which the Government have accepted and will appoint. I fully support that. However, Dame Judith Hackitt’s
report of 2018, made immediately following the Grenfell Tower fire, also recommended that there be a formal log of every element during construction work, including building improvements which may follow. The report recommended that that log should be signed off by the person responsible for the work. This seems to be the fundamental change that is needed. Can the Minister advise whether this particular change is to be implemented?
One of the other key changes proposed by the Hackitt report was that the overall responsibility for building control should return to the local authority for independent oversight. Can the Minister explain why the Statement simply refers to a “review” of building control? Currently, constructors can appoint their own building inspector. The failure of that system is seen in the fire safety corner-cutting in Grenfell Tower and in many other buildings. Does the Minister agree that an independent building inspector is a key change that has to be made?
The failure of the regulatory system that enabled flammable cladding to be added to the walls of many high-rise blocks is at the heart of this scandal, yet the Statement has little to encourage us to believe that essential reform is coming. The Government have published a construction products Green Paper, which is positive but long overdue. The safety of construction products partly depends on the testing regime, which was exposed in the report as being deficient. What are the Government’s intentions for the future of the Building Research Establishment?
Finally, the report refers to “higher-risk buildings”. It states that
“to define a building as ‘higher risk’ by reference only to its height is … arbitrary”,
and recommends that the use of the building is vitally important. Are the Government intending to review the definition as a matter of urgency, as required by the recommendations in the report?
What is needed now is a sense of urgency and purpose. It is more than seven years since that dreadful fire. Survivors need to see that radical change is being made. The tragedy of 72 lives cruelly ended must not have been in vain.
Secondary information
- Type
- Proceeding contribution
- Reference
- 843 cc1930-1
- Session
- 2024-26
- Chamber / Committee
- House of Lords chamber
- Subjects
- Contracts Accountability Construction Housing Licensing Inspections Fines Fire prevention Insulation Fires Managers Prison sentences Standards Government responses High rise flats Regulation Safety Products Repairs and maintenance Grenfell Tower Grenfell Tower Inquiry
- Link
- View this Proceeding contribution on hansard.parliament.uk
Librarians' tools
- Timestamp
- 2026-05-06 11:14:49 +0100
- URI
- http://hansard.intranet.data.parliament.uk/Lords/2025-02-27/25022792000029
- In Indexing
- http://indexing.parliament.uk/Content/Edit/1?uri=http://hansard.intranet.data.parliament.uk/Lords/2025-02-27/25022792000029
- In Solr
- https://search.parliament.uk/claw/solr/?id=http://hansard.intranet.data.parliament.uk/Lords/2025-02-27/25022792000029