Proceeding contribution from Gerald Howarth (Conservative) in the House of Commons on Monday, 20 April 2009. It occurred during Debate on Defence Procurement.
Defence Procurement
The hon. Lady poses an interesting question, to which I fear that I could give a long answer. I shall not do so, however. The private sector has demonstrated its greater ability to run major projects, which is why we need to beef up the professional element of what used to be called the procurement executive—a better description of it, in my view. She has made an important point, but that is something we need to do. Pulling in a half-colonel straight off the front line and telling him to be an integrated project team leader is not the answer. We need professional project managers, with military personnel sitting alongside them to advise them on the practicalities and on what is needed in the field. However, there is a bigger debate to be had on this point.
Secondary information
- Type
- Proceeding contribution
- Reference
- 491 c56-7
- Session
- 2008-09
- Chamber / Committee
- House of Commons chamber
- Subjects
- Armed forces Defence Arms trade Defence equipment Armoured fighting vehicles Finance Iraq Helicopters Nuclear weapons Peacekeeping operations Procurement Proliferation Nuclear Non-Proliferation Treaty Military aircraft Training Vehicles Warships Uniforms Afghanistan Body armour Aircraft carriers Devonport Dockyard Typhoon aircraft F-35 aircraft Future rapid effect system Trident Voyager aircraft Type 45 destroyers
- Link
- View this Proceeding contribution on www.publications.parliament.uk
Librarians' tools
- Timestamp
- 2024-04-21 10:57:33 +0100
- URI
- http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_547879
- In Indexing
- http://indexing.parliament.uk/Content/Edit/1?uri=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_547879
- In Solr
- https://search.parliament.uk/claw/solr/?id=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_547879