Written question asked by Lord Berkeley (Labour) on Thursday, 23 February 2017, in the House of Lords. It was due for an answer on Thursday, 9 March 2017. It was answered by Lord Ahmad of Wimbledon (Conservative) on Thursday, 9 March 2017 on behalf of the Department for Transport.
High Speed 2 Line
- Question
-
To ask Her Majesty’s Government how long they expect journey times to be for HS2 trains between London and (1) Crewe, (2) Edinburgh, and (3) Glasgow, when Phases 1 and 2A are completed, compared with the present Pendolino services, and whether they have estimated the time saving that would be gained if the HS2 trains incorporated a tilting mechanism and so could be used on the West Coast Main Line North of Crewe; and if so, what is that time saving.
- Original answer
-
The proposed HS2 rolling stock tender specification does not preclude a bidder offering a tilting train solution. However, no tilting trains currently operate faster than 250km/h. HS2 Ltd assumes that tilting rolling stock could achieve a maximum operating speed on the high speed network of 300km/h rather than 360km/h for non-tilting rolling stock. This lower maximum operating speed would increase journey times on the dedicated HS2 network and could reduce network capacity. HS2 Ltd has assumed a number of minor line speed improvements on the northern West Coast Main Line for non-tilting rolling stock.
HS2 will not serve Edinburgh until Phase 2B opens. Existing and projected estimated journey times from London Euston are as follows:
Crewe
Glasgow
WCML Pendolino
1h30
4h17
Phase 1 non-tilt
1h08
4h00
Phase 1 tilt
Approx 1h11
Approx 4h00
Phase 2A non-tilt
0h55
3h48
Phase 2A tilt
Approx 1h01
Approx 3h51
-
The answer was corrected by Lord Ahmad of Wimbledon (Conservative)
on Thursday, 9 March 2017 on behalf of the Department for Transport.
- Corrected answer
-
The proposed HS2 rolling stock tender specification does not preclude a bidder offering a tilting train solution. However, no tilting trains currently operate faster than 250km/h. HS2 Ltd assumes that tilting rolling stock could achieve a maximum operating speed on the high speed network of 300km/h rather than 360km/h for non-tilting rolling stock. This lower maximum operating speed would increase journey times on the dedicated HS2 network and could reduce network capacity. HS2 Ltd has assumed a number of minor line speed improvements on the northern West Coast Main Line for non-tilting rolling stock.
HS2 will not serve Edinburgh until Phase 2B opens. Existing and projected estimated journey times from London Euston are as follows:
Crewe
Glasgow
WCML Pendolino
1hr30
4hr17
Phase 1 non-tilt
1h08
4h00
Phase 1 tilt
Approx 1hr11
Approx 4h00
Phase 2A non-tilt
0h55
3h48
Phase 2A tilt
Approx1h01
Approx 3h51
CreweGlasgowWCML Pendolino1h304h17Phase 1 non-tilt1h084h00Phase 1 tiltApprox 1h11Approx 4h00Phase 2A non-tilt0h553h48Phase 2A tiltApprox 1h01Approx 3h51
Secondary information
- Type
- Written question
- Reference
- HL5562
- Session
- 2016-17
- Related items
- Subjects
- Design Trains West Coast main line High Speed 2 line
- Contains statistics
- Yes
- Link
- View this Written question on www.parliament.uk
Librarians' tools
- Timestamp
- 2024-08-28 18:11:05 +0100
- URI
- http://data.parliament.uk/writtenparliamentaryquestion/lords/2016-17/HL5562
- In Indexing
- http://indexing.parliament.uk/Content/Edit/1?uri=http://data.parliament.uk/writtenparliamentaryquestion/lords/2016-17/HL5562
- In Solr
- https://search.parliament.uk/claw/solr/?id=http://data.parliament.uk/writtenparliamentaryquestion/lords/2016-17/HL5562