Skip to main content

Proceeding contribution from Chris Mole (Labour) in the House of Commons on Wednesday, 24 March 2010. It occurred during Adjournment debate on Rail Services (West Kent).


Rail Services (West Kent)

May I say what a pleasure it is, Sir Nicholas, to serve under your chairmanship? I congratulate the hon. Member for Tunbridge Wells (Greg Clark) on securing this debate on rail services in west Kent. The timetable change in December 2009 was the biggest change for 50 years in Kent. Indeed, no train stayed in its existing slot. For west Kent, it included the additional five peak trains mentioned by the hon. Gentleman, one of which is the fast train from High Brooms to London. West Kent also saw the implementation of an enhanced service between Tunbridge Wells and London, which gives the hon. Gentleman's constituents four trains an hour, operating at a 15-minute frequency all day. The changes also included the extension of the Medway Valley line from Paddock Wood, which will improve connectivity and create new journey opportunities. I am pleased to be able to draw attention to these facts, because some people were not convinced that the new integrated Kent franchise would give passengers any benefit. Clearly, that is not the case, and the hon. Gentleman's constituents are some of those who are benefiting from those changes. Southeastern has also invested in automatic ticket gates at Tunbridge Wells. That has improved access and security at the station, and ensures that everyone who travels pays their fair share. I cannot say that I am immediately aware of the rolling stock changes referred to by the hon. Gentleman, but I shall investigate and write to him about those concerns. I realise that since December, performance has deteriorated to below the standard that Southeastern customers now expect. The two main reasons behind that are unreliable infrastructure and adverse weather. However, before I say more on the performance problems since last December, it is important to put Southeastern performance in context. The Southeastern franchise is committed to run more than 20,000 more trains a year on time by the end of the franchise. Indeed, since the start of the franchise, performance has improved. Immediately before the start of the December timetable, 4.2 per cent. more trains arrived at their destination within five minutes of the advertised time, having called at all stations en route. That is more than 10 per cent. better than in the days of the Connex franchise, which indicates that some progress is being made. It may appear unusual to start a debate on the performance of rail services in Kent by talking about the history of such services. I am not saying that there have not been problems with performance, but the evidence does not suggest that they are systemic. What is clear is that since December, performance has fallen below the standards that are expected from Southeastern. None the less, actions are in hand to recover the situation. The lines in west Kent are electrified by the third rail system. It has been established that the third rail system struggles to cope with heavy snowfall and prolonged periods of sub-zero temperatures. During the recent bad weather—the most extreme for some 30 years—we had both and, as a result, performance suffered, but west Kent was not unusual in that regard. The lines in west Kent were particularly badly affected as the weight of the snowfall was, at times, very localised. The geographical lay-out is very challenging for the rail industry, as it is built in deep cuttings and the line has some very steep gradients. That meant that on many occasions during the adverse weather problems it was not possible to deliver a train service. I heard what the hon. Gentleman said about the accuracy of customer information during times of disruption, and I can advise him that there is a rail industry review of customer information, focusing, in particular, on the consistency of the service during the winter period. It will look at ways in which customers can have better and more consistent information available to them through all the channels—whether that be the individual giving advice on the station platform, the web channels or the information displays on the platforms. As the hon. Gentleman will no doubt remember, rail services in Kent suffered from adverse weather in February 2009. Following that, Southeastern advised my Department that it was reviewing its response and that it was going to work with Network Rail to see what improvements could be delivered. One improvement was to implement the key route strategy, which explains some of the shuttle services that the hon. Gentleman described. Network Rail gives priority to the most important routes and every effort is made to keep those routes open. Southeastern also aims to operate services in such a way that as many people as possible, given the prevalent weather conditions, are able to travel. More people were actually moved during the last period of adverse weather in 2010 than in February 2009, despite the fact that the weather was worse. Although lessons were learned following the weather in February 2009, the challenges this time round were more severe. As I have said, the geography of much of the railway in west Kent meant that it was not always possible to offer a service, and when services did run they were often heavily delayed. However, Southeastern has advised me that, together with Network Rail, it is now considering what improvements can be delivered to ensure that more services run during adverse weather.


Secondary information

Type
Proceeding contribution
Reference
508 c95-6WH 
Session
2009-10
Chamber / Committee
Westminster Hall
Subjects
Compensation Kent Railways Passengers Standards Timetables Snow and ice Tunbridge Wells Rolling stock Commuters Southeastern (2006-21) Hastings line
Link
View this Proceeding contribution on www.publications.parliament.uk