Proceeding contribution from Chris Mole (Labour) in the House of Commons on Wednesday, 24 March 2010. It occurred during Adjournment debate on Rail Services (West Kent).
Rail Services (West Kent)
I do not know whether there are commercial sensitivities around the data, but I will try to action my sympathies into something concrete for the hon. Gentleman to look at. As I was saying, Network Rail, Southeastern and South West Trains are considering how to improve the robustness of the third rail electrification system during adverse weather conditions. That could include solutions such as third rail heating. On both reviews, it is too early to know what noticeable improvements will be delivered, but we anticipate significant improvements in robustness. The industry is tackling the challenge head on and seeking to ensure that the services that are offered to rail users in the hon. Gentleman's constituency are improved. The railways are complex, and affordable solutions will come about only following proper consideration. Our performance monitoring shows that in the autumn, traditionally a time of poor performance, there was a step change in improvement in the delays caused by leaves on the line. This year, delays were 18,000 minutes less than in the corresponding period last year. That should give us some confidence that the rail industry can and will deliver improvements in performance during periods of adverse weather. It is regrettable that since December, the infrastructure has not been performing as reliably as it had been. Southeastern has advised me that it has reviewed the causes with Network Rail, as one would expect following a period of poor performance. A series of unanticipated infrastructure failures has surprised all the partners, but through a series of action plans, each particular mode of failure is being addressed. The infrastructure lay-out poses a number of challenges to delivering high levels of performance. First, the trains from west Kent travel via London Bridge. As demand for rail services to and from Kent has grown, the number of trains that travel through this area is much greater than was ever envisaged when the lay-out was designed in the 1970s. It is expected that the £5.5 billion Thameslink programme will improve the lay-out in the London area and provide solutions for many of these issues. Secondly, the Tonbridge to Hastings line has four single line sections, which means that delays escalate much quicker than on sections of line where there are two or more tracks, and that can spread across the whole network. When the line was electrified in 1986, work was carried out to a lower specification as an economy measure, which has led to several operational constraints and complexities. Although there may be technological solutions to some of those issues, the business case is not readily identified. There is no evidence to support the argument that performance has deteriorated solely because of the implementation of the new timetable. As I said earlier, the main causes have been poor weather conditions and unreliable infrastructure. However, since December, 200 more trains are operating on the network. Although that is welcome in normal operating conditions, it can mean that when incidents occur on the network, delays spread quicker than before. The rail industry has to ensure that incidents that cause delay are kept to an absolute minimum. Over the years, it has established robust procedures to manage the delivery of performance. I am confident that such structures will ensure that the high levels of performance planned for this franchise will be delivered. From Monday 7 March to Friday 19 March, the provisional public performance measure for Southeastern was 91.6 per cent. I appreciate that that is for the franchise as a whole and not for the particular route with which the hon. Gentleman is concerned. None the less, I suggest that such a measure provides signs that performance is recovering.
Secondary information
- Type
- Proceeding contribution
- Reference
- 508 c97-8WH
- Session
- 2009-10
- Chamber / Committee
- Westminster Hall
- Subjects
- Compensation Kent Railways Passengers Standards Timetables Snow and ice Tunbridge Wells Rolling stock Commuters Southeastern (2006-21) Hastings line
- Link
- View this Proceeding contribution on www.publications.parliament.uk
Librarians' tools
- Timestamp
- 2023-12-05 22:20:57 +0000
- URI
- http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_633711
- In Indexing
- http://indexing.parliament.uk/Content/Edit/1?uri=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_633711
- In Solr
- https://search.parliament.uk/claw/solr/?id=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_633711