Proceeding contribution from Bob Ainsworth (Labour) in the House of Commons on Thursday, 4 November 2010. It occurred during Debate on Strategic Defence and Security Review.


Strategic Defence and Security Review

I have to say that the answer is, ““Not necessarily.”” I think we would have taken more time and consulted more broadly, however. I think we would have got industry on board and carried more people with us, but I am not sure how well we would have done. I will come on to that issue later, however, as now there is one further point I want to make about the level of settlement that has been achieved. I am genuinely worried about the decision the Government took on the joint strike fighter. The Prime Minister's announcement on the strategic defence review revealed that we have not only not funded the carriers, but we have bought the wrong aircraft. The Government have, effectively, done away with our short take-off and vertical landing capability not for 10 years because of the early demise of the Harrier, but for ever. We will therefore end up with the JSF and the Typhoons. They will be two separate fleets, and small fleets too, because there will not be the money to expand either of them. We will be faced with the running costs of those two separate fleets as well, when they have fundamentally the same capability. I know that the JSF has stealth whereas the Typhoon does not, but the Typhoon is a pretty impressive beast, and we are going to wind up paying for two separate sets of maintenance for two separate fleets of fast jets that do fundamentally the same thing, but having given up short take-off and vertical landing capability. That capability is not only required for flying off carriers; it is required for other scenarios too—day-one warfare involving failed states, for example. A Harrier can take off in a big car park, but the JSF basically needs a full-size runway in order to be able to operate. That capability would be greatly valued by the US Marine Corps if the programme had been maintained, but now that the British Government have pulled out it will not be available to us. I am not at all sure that the Government have not made a significant mistake in that regard. Let me return to how well the Government did. The Defence Secretary fought his corner and the headline cut in the defence budget is 8%, but in reality it is 13%. That is because the Treasury has won and it has transferred the costs of the deterrent to the core budget. That is getting very little attention, but it is equivalent to another 5% cut in the defence budget. The Government put off the decision on the renewal of the deterrent and the Prime Minister told the House in a fantastic piece of salesmanship that he had actually managed to save money while doing so. Well, he managed to save money by the normal process of the initial gate assessment that is going on: by cutting the number of warheads and of tubes. That would have been done, irrespective of who the Government were, as part of the assessment phase of the deterrent, because both parties are committed to the maintenance of a minimum credible nuclear deterrent. But again the decision to delay the deterrent was one made for political reasons—for coalition reasons—not for industrial reasons or for reasons of capability. No matter what the Prime Minister tries to say to the House, that decision, on its own, costs this country billions of pounds—it certainly costs in excess of £1 billion and I would say the figure is probably £2 billion. So for the purposes of keeping peace in the coalition for the next five years, we have thrown away between £1 billion and £2 billion on the deterrent. The Prime Minister accused us, with a degree of justification, of shirking hard decisions and pushing things to the right, but while he was saying that—while those words were falling from his mouth—he was doing exactly the same thing. That is one reason why this is not a strategic defence review but a political fix and a spending review, and most certainly with regard to Trident. As a result of that, my party—I know that the Liberal Democrats will have to do this—may well have to consider whether or not we maintain our position on Trident. We set the position in 2006 and we held to it. We did not try, as the Liberal Democrats did, some short-term political fix to pretend that we had another way. But if no decision is to be taken for another five years and if the cost of a like-for-like replacement of Trident will fall wholly and solely on the defence budget, at the cost of other military capability, we will have to think seriously about whether there is another way. We will also have to use the time, the expertise that exists in think-tanks and some of the information that will come from the armed forces themselves, now that the pressure is on and they are paying for the deterrent in alternative capability, to see whether there is some other way of maintaining Britain's deterrent without the huge cost that will come at the expense of the rest of our armed forces.


Secondary information

Type
Proceeding contribution
Reference
517 c1089-90 
Session
2010-12
Chamber / Committee
House of Commons chamber
Subjects
Counter-terrorism Armed forces Defence Defence equipment Public expenditure Procurement Military bases Ministry of Defence Afghanistan Aircraft carriers ISAF BAE Systems Strategic Defence and Security Review
Link
View this Proceeding contribution on www.publications.parliament.uk