Proceeding contribution from Lord Jenkin of Roding (Conservative) in the House of Lords on Wednesday, 22 October 2008. It occurred during Debate on bill on Energy Bill.
Energy Bill
My Lords, I apologise for interrupting the noble Lord when we were hearing interesting facts about his own development, but there is one problem that one should perhaps note. One has, again, heard the argument that, if the cap is set too high, so that it takes in not just the micro-range but the medium-range, as it were, of renewable or other generating technologies that would use the feed-in tariff, there could be considerable difficulties not so much within the major transmission networks but on the local distribution networks. There would be the problem of trying to maintain a balance, as they have to maintain the required output minute by minute. Has the noble Lord had the same information on that? Perhaps the Minister could deal with that when he replies.
Secondary information
- Type
- Proceeding contribution
- Reference
- 704 c1172
- Session
- 2007-08
- Chamber / Committee
- House of Lords chamber
- Subjects
- Decommissioning Costs Combined heat and power Carbon dioxide Fees and charges Licensing Energy Electricity generation Oil Planning permission Nuclear power Nuclear power stations Noise Meters Microgeneration Storage Safety Renewable energy Technology Wind power Geothermal power Renewables obligation Nuclear Liabilities Financing Assurance Board
- Legislation
- Energy Bill 2007-08
- Link
- View this Proceeding contribution on www.publications.parliament.uk
Librarians' tools
- Timestamp
- 2023-12-16 01:01:18 +0000
- URI
- http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_502760
- In Indexing
- http://indexing.parliament.uk/Content/Edit/1?uri=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_502760
- In Solr
- https://search.parliament.uk/claw/solr/?id=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_502760