If we achieve nuclear fusion, it will be the best solution to the problem of the world's future energy supply. It would provide a safe form of energy that is environmentally friendly, does not use up limited resources and should be economically competitive. I believe that most scientists would agree with that. However, it is a solution that always seems to be at least 35 years away. Will we ever get there? Is it worth the large investment in capital and science that it requires? There are sceptics who say that it is not. That is why I raise the Question. I want to find out the Government's assessment of the prospects and priorities. In particular, I want to know the view of the Science Minister. I am delighted that he will answer this short debate; a lot of us have very high hopes of him. I am not an expert and the science involved is way beyond me but, after a recent visit to Culham and after a recent meeting in the Commons attended by a very high-powered group from Culham, which I am ashamed to say was attended by only three Peers and two MPs, I shall draw the picture as I see it. This shows how interested Parliament is in the big scientific issues of our time. To achieve the conditions of fusion, two isotopes of hydrogen, deuterium and tritium must be heated to a temperature of over 100 million degrees centigrade, 10 times hotter than the centre of the sun, at which temperature they become an ionised gas called a plasma. In a structural device or machine called a tokamak which contains a vacuum chamber, the plasma is held away from the walls of the chamber by magnetic fields. The plasma must be kept away from the walls to protect them from damage and prevent pollution of the plasma. Magnetic confinement seems to be one of the most effective ways of doing so. At these very high temperatures, the two particles of deuterium and tritium are forced together long enough to bring them into collision, when their nuclei fuse to form helium, and an energetic particle is ejected, a neutron, which is captured in a so-called breeding blanket that surrounds the plasma. This neutron heats the blanket, which in turn provides the heat that generates steam for turbines. Deuterium is abundant and found in sea water. Tritium is not, and apart from what is required for the start-up, the fusion process requires that tritium is made on site. This occurs because the breeding blanket contains lithium and the reaction between the neutron and the lithium creates tritium. There are several tokamaks in different parts of the world, but the largest is in Culham, the site of JET, the Joint European Torus. The tokamak has a toroidal shape, hence the title of the machine. One of the many impressive things about JET is that it is a splendid example of effective international co-operation, not only within the European Union, but with China, the United States, Russia, Japan, South Korea and now India; in fact, representatives of more than half the peoples of the world. China, whose technology in this field is apparently well advanced, is particularly interested and committed, and recently sent a very high-powered delegation to Culham. Their reaction was very positive. As an aside, I might mention that the Chinese seem to think long term in a way that the West often does not. For example, about half the world’s R&D in agricultural biotechnology is now done in China because of the importance that the Chinese attach to it, but that is by the way. The fact that fusion may still be at least three decades away does not put them off at all. Impressive progress to obtain power from nuclear fusion has undoubtedly been made in recent years. Temperatures of over 100 million degrees centigrade have been attained. In 1991, JET achieved controlled deuterium-tritium fusion reactions for the first time on Earth. In 1997, JET produced fusion power in the megawatt range for some seconds, with a maximum of 16 megawatts. Constriction has now started on ITER in the south of France; ITER, as I am sure all Members of the Committee will know, is Latin for ““a journey””. It will be a much bigger tokamak, twice the size of JET, and is the most ambitious scientific project in the world. It is expected to produce power in the hundreds of megawatts, and emit 10 times more energy than it puts in. However, it will still be an experimental facility. It should provide data which is needed to decide the size of an economic commercial reactor and, in particular, a pilot reactor to be built called DEMO. I understand that work at Culham is vital to prepare for the work to be done at ITER and, indeed, DEMO. It is not only what we can learn from JET but also from another, smaller, tokomak built at Culham: the Mega Amp Spherical Tokomak, or MAST. This is a more compact device of a different spherical shape, which needs a smaller magnetic field to hold the plasma and keep it stable. I gather that MAST has been in operation since 2000 and a lot has been learnt from it about how plasmas behave. If that brief, rather inadequate, description of the scene is roughly correct, it suggests that very good progress has been and is being made and that, given the huge prize to be won if we produce commercial fusion power, the world fusion programme needs every bit of support that we and the rest of the world can muster. But what are the obstacles? It seems that we have achieved the conditions for fusion. But can materials handle the very high transient heat loads that are repetitively ejected onto material surfaces? I gather the main centre for materials testing is in Japan: the International Fusion Materials Irradiation Facility. What is our view of the prospects for developing the right materials? Should we not back the construction of a relatively small components test facility? I gather that an important contribution to this would be more investment to upgrade MAST and a similar spherical tokamak in the US. MAST would require additional capital of some £60 million. Is this being given consideration? How do the Government view the likelihood that we can achieve continuous operation? How serious is the chance that we cannot? I understand that JET operates for 20 seconds at a time, for about 10 hours a day, about one day in four. ITER, I understand, will take the operating time to about one and a half hours, 10 times a day, while DEMO, it is hoped, will operate continuously. Will ITER receive sufficient financial backing? Cost estimates have already increased sharply. In the past, enthusiasm for supporting fusion has risen when the price of oil has risen, and dropped when the price of oil has dropped. Can we and other nations provide guaranteed, steady support? Our own national budget for fusion is many times smaller than that of Germany, France or Italy. Should we not give it higher priority? How can we avoid the usual national manoeuvring in an international body? It took years to choose a site for ITER. What prospects are there that we will not see unnecessary delays in ITER’s work? JET seems to be functioning very well. The future of fusion is a huge question and we cannot hope to do more than just touch on it in a very brief debate, drawing attention to its importance and raising a few of the big issues involved. I doubt if many will take much notice of what we say. As I said at the beginning, interest in Parliament is not high. Maybe, however, we will encourage others to follow up our debate.


Secondary information

Type
Proceeding contribution
Reference
707 c235-7GC 
Session
2008-09
Chamber / Committee
House of Lords Grand Committee
Subjects
Components Finance Energy supply Facilities Universities Research Testing Engineers Scientists Joint European torus Nuclear fusion Fusion reactors ITER
Link
View this Proceeding contribution on www.publications.parliament.uk