Proceeding contribution from Lord Hunt of Kings Heath (Labour) in the House of Lords on Thursday, 11 March 2010. It occurred during Debate on Draft National Policy Statement for Fossil Fuel Electricity Generating Infrastructure (EN-2).
Draft National Policy Statement for Fossil Fuel Electricity Generating Infrastructure (EN-2)
My Lords, I get the message. Carbon capture ready means that all new combustion power stations of more than 300 megawatts must prove at the consent stage that no foreseeable barriers exist to the future retrofit of carbon capture equipment. It means that developers must leave suitable space on site for carbon capture equipment. They must demonstrate through a number of assessments that it will be possible to retrofit such equipment to the power station, that they have identified a suitable area offshore where captured CO2 can be stored, and that it will be possible to transport the CO2 from the plant to the storage area. No plants will gain consent until they can demonstrate that they are carbon capture ready.
Secondary information
- Type
- Proceeding contribution
- Reference
- 718 c176-7GC
- Session
- 2009-10
- Chamber / Committee
- House of Lords Grand Committee
- Subjects
- Coal fired power stations Carbon capture and storage Electricity generation Electricity Infrastructure Electric cables Oil Planning permission Planning Natural gas Parliamentary scrutiny Pipelines Storage Renewable energy Wind power National grid Fossil fuelled power stations Liquefied natural gas Infrastructure Planning Commission National policy statements
- Link
- View this Proceeding contribution on www.publications.parliament.uk
Librarians' tools
- Timestamp
- 2024-04-22 01:48:57 +0100
- URI
- http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_630088
- In Indexing
- http://indexing.parliament.uk/Content/Edit/1?uri=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_630088
- In Solr
- https://search.parliament.uk/claw/solr/?id=http://data.parliament.uk/pimsdata/hansard/CONTRIBUTION_630088